China PTH® Quick Installation In 8 Hours Prefab Modular House With Kitchen Bedroom Bathroom Foldable Portable Home
China PTH® Quick Installation In 8 Hours Prefab Modular House With Kitchen Bedroom Bathroom Foldable Portable Home
China PTH® Quick Installation In 8 Hours Prefab Modular House With Kitchen Bedroom Bathroom Foldable Portable Home
China PTH® Quick Installation In 8 Hours Prefab Modular House With Kitchen Bedroom Bathroom Foldable Portable Home
China PTH® Quick Installation In 8 Hours Prefab Modular House With Kitchen Bedroom Bathroom Foldable Portable Home

China PTH® Quick Installation In 8 Hours Prefab Modular House With Kitchen Bedroom Bathroom Foldable Portable Home

Negotiable

Min.Order:1

Supply Ability:
1000 per Month
Payment Terms:
T/T Credit Card

Zhejiang Putian Integrated Housing Co., Ltd.

Business Type: Buying Office
Main Products: , , ,

Product Details

Prefab-X Quick assembly houses Q43㎡ or Q29
Detailed Photos
Specifications
Anti Seismic
Second level (9 degrees)
Outdoor height
2.86m
Size after expanding
6.038m*7.142m
Fire-resistance
Level 3(0.5 hours)
R value
2.95K.m/W
Indoor height
2.46~2.59m
Wind-resistance
200km/h (Level 16)
Durability
50 years
Snow load
1.0 kN/㎡
Loading
20 ft SOC
Sound-insulate
≥60db
Products Description
Configuration table
Configuration
1.Windows:bridge-cutoff insulated aluminum alloy frame + double glazing unit 2.Outside door: bridge-cutoff insulated aluminum alloy frame + double glazing unit 3.Inside door:aluminum alloy frame+solid wood composite door 4.Anti-weathering coating profiled metal board 5.Imitation wood 6.Wall filling:High thermal insulation PIR 7.Nano-tech inside wall: Bamboo wood fiberboard 8.SPC locking floor, Anticorrosive and pressure resistant 9.Shower room with a four-in-one bath heater,explosion-proof tempered glass sliding door 10.Wash basin&cabinet and mirror 11.Toliet 12.Switchs, socket,recessed LED ceiling light
Option
1.5 constant Smart air system 2.kitchen floor cabinet with stainless steel sink and stone countertop 3.Closet for partition wall 4.Parapet wall 5.Wall-mounted cupboard 6.Integrated stove with induction cooker and range hood 7.40 L Water heater 8.Solar power system 9.Eletrical roller door 10.Eletrical roller windows 11.Sofa table 12.Dinner tabel 13.Dinner chair 14.Washing machine 15.Dryer 16.Washing machine With dryer Function 17.TV 18.Sofa 19.Master room bed,Secondary room bed 20.Mattress 21.Spiral pile foundation 22.Footing beam
Other Products

CONTAINER HOUSE

DOUBLE-C STRUCTURE

LIGHT GAUGE STEEL

STEEL STRUCTURE BUILDING

Company Profile
1.Contact us
Contact us by Phone/Email/LinkedIn/WeChat
2.Drawing and Quotation
Tell us what you want,our sales man and designer give you the best proposal for your container house project.
3.Finalize contract
Finalize details for price,payment,shipment time,and sign the contract.
4.Producing
Start production upon receipt of down payment,the sales follows up the producing progress.
5.Inspection
QC team will make routine inspection in each process,and provide inspection report.
6.Packing&Shipment
Packing all the parts onto the steel rack , load into the shipping container ; contact shipping forwarder and ship to the final port as customer directed.
7.Install
PTH provide complete installation drawing,or PTH send engineer to the site to give the installation guidance.For the new type container house, ordinary people can assemble it like the furniture, no need heavy crane.
8.After-sale service
Anytime,any problem,our sales man and engineer will try our best to help your solve it.
FAQ
1. Do you provide on-site installation service?
1) Only large projects provide installation services
2) General projects, we can provide Installation guide service based on customers' request.
3) Installation supervision charge standard: 150USD/day, customer should responsible for the travel fee, accommodation, translation fee, and ensure staff's health and safety.
2.What's your delivery time?
Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 15 days after receive deposit. Large order delivery time should be arranged separately.
3.How to control the quality of your product?
a. quality of the design: think about possible problems in advance and provide a high-quality design solution.
b. quality of the raw material: choose the qualified raw material
c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.
4. How to deal with quality problems?
Warranty is 2 years. Within the warranty period, PTH will responsible for all quality problems caused by production.
5. If there is a clear service life of your products? If have, how long?
Under conventional climate and environment, the service life of container house steel frame is 20 years
6. What designs do you have in different climates (How can the products adopt to different climates)?
Strong wind region: improve the wind-resisting ability of the internal structure. Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.High corrosion region: use corrosion resistant material, or paint anticorrosive coating.

Contact Supplier

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Construction & Real Estate > Real Estate > Prefab Houses
Categories
Hi~