Base Welding Machine for LPG and Gas Cylinder
Negotiable
Min.Order:1
Base Welding Machine for LPG and Gas Cylinder
Company Introduction:
Shandong Zentek Energy &Power Co.,Ltd is one of reliable manufacturer and supplier for full lines of producing LPG cylinder for many years,as the memeber of CSP group,we have done many projects around the world,such as India,Middle East,Africa and so on.
We are very strong in Design,Manufacturing,Engineeing,Installation and Training for our customer projects.The turnkey project is our favor.Also,if you need some single machine we can help as well.
All the component and electrical parts we are using either china or international brand names ,in order to make sure the quality.Such as Panasonic,Schneider,Simens ,Omron and so on.
Datasheet for Trimming Machine:
Our Trimming machine is used in cutting the edge of cylinder’s envelop without any scraps. The machine adopts clamping by gas jar, automatically feeding and cutting by inclining hob, and adjustable angle of slope. It collects machinery, electrics and gas to one unit, with reasonable framework, trustful performance, easily operating,
Rated Input Voltage, Phase | V | AC 220V Three Phase | |||
Allowable Range of Voltage Fluctuation | V | 220±10% | |||
Rated Frequency | Hz | 50 | |||
Motor |
Rated Power | W | 250 | ||
Rated Speed | R/min | 1400 | |||
Welding Speed Regulation | R/min | 0~1.6 | |||
Welding Torque Regulation |
Front and Back | mm | 0~100 | ||
Left and Right | mm | 0~100 | |||
Up and Down | mm | 0~100 | |||
Equipment welding range |
Diameter | mm | Φ100~Φ600 | ||
Compressed air pressure | Map | 0.4~0.7 | |||
Welding Gun |
Amount |
Pcs | 1 | ||
Cooling Method |
|
Natural Air Cooling |
Production Time:
30 days after the payment ,or by order
Project Reference:
Installation and Training:
30days by 4 engineers and 1 translator
Our advantage:
1..R&D
2.Desigin according to the customer requirement
3.Reasonbale price with super quality
4.Installation and training
5.Production Operation support
6.Over 15 years experences
7.many turnkey projects good reference and experences
8.Fast delivery and follow international business rules
9.1 year warranty
10.over 15 years lifespan for our machines
Questions for reference:
1.do you accept OEM?
Yes ,we do
2.what is your loading port?
Qingdao
3.what is the production time?
normally 60 days,in case you have urgently demand,we can make it fast
4.whats is the payment term?
30% advance,70% against copy of BL,or by irrevocableL/C at sight
5.what is the warranty for your machines?
1 years,over 15 years lifespan
6.what is the package?
suitable for container loading or by order
7.can we send engineer to inspect our machines before loading?
most welcome and it is very necessory