Auto Spare Parts Rear Trunk Gas Lift Cylinders Damper gas strut for Mitsubishi Triton 2005-2015
Negotiable
Min.Order:1
Zhuhai Oudun Auto Parts Co., Ltd.
High quality Auto Spare Parts damper for Ford Ranger 2012-2016
Automotive parts tailgate hydraulic cylinder gas strut for Toyota Avanza 2005-
Car Spare Parts Tailgate Springs gas strut for Toyota Innova
Tailgate Springs Hydraulic Lift Cylinder gas strut for Ssangyong Rexton 2002-
Rear trunk gas spring gas strut for toyota Hiace High roof New 770mm
1. Gas: Nitrogen(99.999%).
2.Long life :150,000 cycle life time,one cycle means one up and one down .
3. Material: finishing rolling seamless steel tube for cylinder, steel for piston rod.
4. Surface: spray painting for cylinder, QPQ for piston rod.
5. Color : black, or as your requirement.
6. Operating Temperature Range: -15~+80℃(5~176℉)as standard; -50~+80℃(-58~+176℉) or -15~200℃(5~392℉) are available.
2002-2009 Kia Sorento
Ford Ranger 2012-2016
2005- Suzuki Swift III
Zhuhai Oudun Auto Parts Co., Ltd. is one of the most professional manufacturer of gas spring. We have been in this line for about 10 years. We are specialized in producing Lockable Gas Spring, Tailgate Dampers, Tension Gas Spring, Switch and a series of relative products. Our company devote itself to provide the high quality gas strut with professional certification, like SGS 150000 Cycles Durability Test, ROHS and ISO9001. Our product are commonly used for Automobile, Medical Equipment, Furniture,Tools and Machinery .
Poly Bag Packaging
White Paper Box Packaging
Factory Standard Packaging
Our most professional packaging
Transport of large trucks to the seaport
And international transport cooperation
1. OEM Manufacturing welcome: Product, Package...
2. Sample order
3. We will reply you for your inquiry in 24 hours.
4. after sending, we will track the products for you once every two days, until you get the products. When you got the
goods, test them, and give me a feedback.If you have any questions about the problem, contact with us, we will offer
the solve way for you.
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 25 to 30 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.