Automatic Glass Bottle micro brewery small scale Beer Bottling machine Equipment Filling Line
Negotiable
Min.Order:1
Automatic Glass Bottle Beer Bottling Equipment / Filling Line
Brief introduction of Automatic Glass Bottle Beer Bottling Equipment :
Machine description
1. This machine integrating washing bottle, filling and capping in one unit.
1.Feeding bottle on belt by manual, bottles going to washing part by conveying belt, washing bottle gripper gripping bottle neck, along washing bottle pathway overturning 180°, water pump opening, water spraying bottle inside and outside, then drying along washing bottle pathway overturning 180°, bottles come out by conveying belt, and entering into filling position, with hanging bottle neck positioned filling machine lifting mechanism on cliping bottle neck plate, make the bottles lift up, fit to filling . During lifting process, check bottle on cliping bottle neck or not. If with bottle, then starts filling beer. If no bottles, then the filling valves remain close state. After finishing filling, bottle lifting mechanism go down, the filled beer bottle sent into capping machine by star wheel, after capping, the bottle is sent out through star wheel to conveyor belt.
2.Emphasis on opening machine design, minimized the machines’ components, smooth and easy design, washing, filling capping part in one working table, take deep consideration of corrosion resistance , all parts contacting with liquid uses SUS304, and design for all pipes and connection joint, bending radius , design is streamline without hygiene corner.
3. Consider bottle characteristics, adopt cam lifting way, stable operation, and increase filling central device to make the filling more accurately.
5. For beer characteristics, beer tank and filling valve is customized made.
Additional increase diaphragm valve to ensure beer supplying stability ,reduce beer foaming, make sure that beer level accuracy.
6. Pressure preparation is combined controlled by solenoid valve under working table, with PLC and electrode points pressure gauge. Beer tank is prepared pressure first, then feeding beer. If too big pressure with feeding beer, beer tank will air exhaust to set up pressure, if pressure is not enough, CO2 will feed to beer tank for pressure preparation to reach to required pressure.
7. The main purpose of water injecting and foaming device is filtered by high pressure and heated water , and for high pressure waterline sent into bottle , and make bubble, and take out air from the bottle, and ensure the quality of beer.
Machine picture:
Washing Part
Filling Part
Capping Part
Main technical data:
Model | Washing head no. | Filling head no. | Capping head no. | Production capacity(500ml) | Overall size(mm) | Weight(kg) |
Power of main motor (kw) |
8-8-3 |
8 | 8 | 3 |
1500-2000 |
1700*1500*2100 |
2000 |
1.8 |
14-12-4 |
14 | 12 | 5 |
3000-4000 |
2000*1760*2350 |
2500 |
2.0 |
16-12-6 |
16 | 12 | 6 |
5000-6000 |
2100*1800*2400 |
2800 |
2.2 |
18-18-6 |
18 | 18 | 6 |
7000-8000 |
2300*1900*2400 |
3000 |
3.5 |
24-24-8 |
24 | 24 | 8 |
8000-10000 |
2900*2100*2400 |
3500 |
4.5 |
32-32-10 |
32 | 32 | 10 |
12500-15000 |
3100*2100*2650 |
4300 |
5.5 |
40-40-10 |
40 | 40 | 10 |
15000-18000 |
4350*2880*3200 |
6000 |
5.5 |
50-50-12 |
50 | 50 | 12 |
20000-23000 |
4850*3800*3200 |
7500 |
7.5 |
Q1: How to find suitable machine or complete beverage production line?
A1: Looking for beverage filling machine in www.grandeemachine.en.china.cn
•Enquiry: Contact us by email, phone call, fax, Instant Messenger (Trade manager, Skype, WhatsApp, Wechat) and let us know your requirements
• Discussion: Specify the items and what are you exactly looking for.
Q2: Are you a trading company or a manufactory?
A2: We are the manufacture of water/beverage filling machine and water treatment system over 10 years.We just not only sell drinking water machines and other related equipment , Quality is our culture. We have rich experienced engineers with technicians working team , providing good and after-sales service term , professional salesman terms .
Q3: Do you have technical support after we purchased your machines?
A3: We will arrange our professional technical to go aboard to your factory, they will help you and teach you how to install and maintenance the machines which you purchased. Or help you to fix machine when it has problems.
Q4: If you buy our machines, can you offer us wear-out spare pats?
A4: We provide our high quality machine 2 years guarantee , and we will also offer you 2 years wear-out spare parts for free. Once your machines broken or doesn't work within 2 years and you can't solve it, firstly, we will try to help you to find problems from your words description by phone or other communication tolls. Secondly, if the phone solutions still not work, our engineers will go to your factory to solve it. Meanwhile, they will teach you the related experiences for fixing.