car spare parts wheel bearing kit for daewoo VKBA 3255
Negotiable
Min.Order:1
Shanghai BTE Spare Part Manufacturing Co., Ltd.
car spare parts front wheel bearing for ford mazda 98AB1238AD
car front wheel hub bearing assembly for ford transit bus 1C1J 1K018 AA
car front wheel hub bearing assembly for opel vauxhall 93188477
car front wheel hub bearing assembly for isuzu nissan 40210VW000
car rear wheel hub bearing assembly for vw audi seat skoda 6Q0 598 611
Working life | 20,000 Kms | Materials | steel |
OEM | ACCEPTABLE | Application | wheel |
Dimension | standard | Certification | ISO |
OEM | acceptable | Warranty | 1 years |
Item Name | wheel bearing | Function | for transmission |
Sort | wheel bearing kits | MOQ | 10 Piece |
Model Number | 520520 | Price | 1-50USD/PCS |
Net weight | 0.21kg | Port | Shanghai |
1.Supply to Europe, noth and south america,Asian
2.Matrial: bearing steel
3.Professional Perfomance Auto parts supplier
Shanghai BTE Spare Part Manufacturing Co., ltd is located in Asia's largest auto parts. We are a professional manufacturer of auto belt tensioner,wheel hub bearing,clutch release bearing and other auto bearings. We features a wide range of products covering the European and Japanese brand cars. Our products range is not only for passenger cars,also for heavy duty trucks.
All of our products are controlled for the European standard and engineering. we offer our customesr the reasonable price and on-time delivery.
1. OEM Manufacturing welcome: Product, Package...
2. Sample order
3. We will reply you for your inquiry in 24 hours.
4. after sending, we will track the products for you once every two days, until you get the products. When you got the
goods, test them, and give me a feedback.If you have any questions about the problem, contact with us, we will offer
the solve way for you.
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 75 to 90 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.