Mobile alluvial gold trommel screener machine for sale
Negotiable
Min.Order:1
Factory direct sale alluvial mine trommel alluvial portable diamond mining equipment
Wholesale manufacturer rotary gold trommel screen sieve design custom drum screen sieve
The drum machine and gold trommel washing machine transported to Mexico
Counter flow firewood chip /compost fertilizer rotary drum screen machine for sale
Gold mining machine gold wash plant trommel screen price from manufacture
Model | Capacity (t/h) | Power (kw) | Diameter (mm) | Length (mm) | Discharge (mm) | Input (mm) | Dimension (mm) |
YGTS1020 | 20-30 | 4 | 1000 | 2000 | 0-100 | ≤300 | 3390×1400×2140 |
YGTS1225 | 30-50 | 5.5 | 1200 | 2500 | 0-100 | ≤300 | 4146×1600×2680 |
YGTS1545 | 50-120 | 11 | 1500 | 4500 | 0-100 | ≤400 | 8160×2300×3080 |
YGTS1548 | 80-150 | 15 | 1800 | 4800 | 0-100 | ≤400 | 8460×2300×2500 |
YGTS1848 | 100-200 | 15 | 1800 | 4800 | 0-100 | ≤400 | 8460×2300×2700 |
YGTS2060 | 300-400 | 30 | 2000 | 6000 | 0-100 | ≤400 | 9680×2300×3420 |
1. Q: How do I choose a suitable trommel screen for my project?
A: In your first inquiry, please offer us information about your raw materials, its size, moisture, and the shape of final briquette you required, also tell the output per hour you required.
2. Q: What is the binder in process?
A: It is depend on the properties of your raw materials and also usage of briquettes. We have some formula of binders for some of raw materials, we would like to share them to our customers.
3. Q: After ordered a trommel screen, how do we slove the equipment installing?
A: For a small single trommel screen, we offer you user manual, customer will install and commissioning as operating introduction; For a complete briquette machine production line, we will send our engineer to your workplace to help you install and commissioning untill machines work normally.
4. Q: What's the delivery time after I pay the deposit?
A: We will clear delivery time in slaes contract, Single briquette machine often deliveried within 10-15 working days after receipt of the pre-payment. Complete production line will delivery within 25-40 working days after receipt of the pre-payment.
5. Q: How long of your machine quality guarantee terms ?
A: Quality guarantee time is one year(wearing parts excluded).