Customized diesel engine small scale ore mine limestone wet dry used ball mill machine stone grinding gold ball mill for sale
Negotiable
Min.Order:1
Gongyi Hengchang Metallurgical Building Material Equipments Plant
Customized diesel engine small scale ore mine limestone wet dry used ball mill machine stone grinding gold ball mill for sale |
Model | Cylinder Rotating Speed (r/min) | Ball weight (t) | Feeding Size (mm) | Discharging Size (mm) | Capacity (t/h) | Power (kw) |
Ф900×1800 | 38 | 1.5 | ≤20 | 0.075-0.89 | 0.65-2 | 18.5 |
Ф900×3000 | 38 | 2.7 | ≤20 | 0.075-0.89 | 1.1-3.5 | 22 |
Ф1200×2400 | 35 | 4.6 | ≤25 | 0.075-0.6 | 1.6-5.8 | 37 |
Ф1200×4500 | 35 | 5.5 | ≤25 | 0.074-0.4 | 1.6-5.8 | 55 |
Ф1500×3000 | 29 | 9 | ≤25 | 0.074-0.4 | 2-7 | 75 |
Ф1500×5700 | 29 | 17 | ≤25 | 0.074-0.4 | 3.5-6 | 110-130 |
Ф1830×4500 | 25.4 | 15 | ≤25 | 0.074-0.4 | 4.5-12 | 155 |
Ф1830×6400 | 24.1 | 21 | ≤25 | 0.074-0.4 | 6.5-15 | 210 |
Ф1830×7000 | 24.1 | 23 | ≤25 | 0.074-0.4 | 7.5-17 | 245 |
Ф2100×4500 | 23.7 | 24 | ≤25 | 0.074-0.4 | 8-43 | 245 |
Ф2100×7000 | 23.7 | 26 | ≤25 | 0.074-0.4 | 8-48 | 280 |
Ф2200×4500 | 21.5 | 27 | ≤25 | 0.074-0.4 | 9-45 | 280 |
Ф2200×6500 | 21.7 | 35 | ≤25 | 0.074-0.4 | 14-26 | 380 |
Ф2200×7000 | 21.7 | 35 | ≤25 | 0.074-0.4 | 15-28 | 380 |
Ф2400×3000 | 21 | 23 | ≤25 | 0.074-0.4 | 30-50 | 245 |
Ф2400×4500 | 21 | 30 | ≤25 | 0.074-0.4 | 40-60 | 320 |
Ф2700×3600 | 20.7 | 40 | ≤25 | 0.074-0.4 | 45-80 | 430 |
Ф2700×4500 | 20.7 | 48 | ≤25 | 0.074-0.4 | 50-90 | 430 |
Ф2700×13000 | 20.7 | 60 | ≤25 | 0.074-0.4 | 50-90 | 630 |
Ф3200×4500 | 18 | 65 | ≤25 | 0.074-0.4 | -- | 800 |
Packaging Details: Normally the machines are taken apart before delivery and are packed by suitable packing ways, the packing ways are as below: Nude packing. Bundle packing. Grass rope packing. Water proof packing. Wooden pallets packing. Wooden box or carton box packing. | ||||||||
Delivery Time: We will customize according to the actual needs of customers. Senior designers start to design the plan. After receiving the deposit, we will complete the delivery within 15 to 25working days. | ||||||||
RFQ | ||||||||