Mobile gold cip plant:
1.After the crushing and grinding stage, add 9 step-arranged high-efficiency cyanidation leaching tanks into the pulp. Gold pulp cyanidation is carried on the first two leaching tanks, countercurrent adsorption operation is carried on the last six or seven leaching tanks (cyanidation and adding activated carbon simultaneously).
2.In the adding activated carbon step, add the coconut shell activated carbon (small hole, high activity, wear-resisting and renewable) specially selected by Xinhai mineral processing design institute into the pulp, which can dissolve and adsorb the gold and silver ions then form the gold loaded carbon according to the characteristics of gold and silver adsorption.
3.Vibrating screen and dewatering screen are the key equipment for the reverse movement of pulp and carbon. Filter press and high frequency dewatering screen developed by Xinhai can effectively reduce the carbon wear on the surface of vibrating screen and in the process of continuous slurry pumping, and reduce the cost, facipitate the maintenance and operation.
Air lifter used in the agitation process can make the slurry carry on small minor-cycle. Hengchang air lifter greatly reduces the power consumption by 70%, and make the solid materials suspend uniformly, the wear of activated carbon is small, and the recovery
of gold is high, which is an important equipment in the modern gold cyanide plant.
4.Hengchang desorption electrolysis system implements high-temperature desorption electrolysis on gold in the gold-loaded carbon through the mixed liquor of sodium cyanide and sodium hydroxide. After wood chips and other sundries are removed by washing
machine, and the gold desorption is carried out by Xinhai high-temperature and high-pressure desorption method (150 degrees and 0.5Mpa), which can resolve 99% of gold within 2-6 hours.