Longxing Factory Price China Vibrating Screen for Powder Chemical Machinery Equipment
Negotiable
Min.Order:1
Shandong Longxing Chemical Machinery Group Co., Ltd.
Manufacture Factory Price Vibrating Screen for Powder Chemical Machinery Equipment
Chemical Opened Style Water Storage Tank/Liquid Storing Tank
Stainless steel storage tank/Water storage tank/Liquid storage tank
Longxing Factory Price Liquefied Petroleum Gas Storage Tank LPG Pressure Vessel Equipment
Working Principle:
Through the elastic soft actuator, drive the unique oscillator to produce the vibration exciting force, make the sieve vibrating and segragate the material. Adjust the space angle of the heavy punch on the up and down. Effectively change the movement track of the material, extend or shorten the retention period of material on the screen to realize the ideal screening effect.
1. FSZ multilayer powder vibrating sieve
Technical Parameter
Type | 450 | 600 | 800 | 1000 |
| |||||||||||||||||||||
Layer | 1 | 2 | 3 | 1 | 2 | 3 | 1 | 2 | 3 | 1 | 2 | 3 |
| |||||||||||||
Motor Power(Kw) | 120 | 120 | 150 | 180 | 180 | 300 | 300 | 300 | 400 | 300 | 300 | 400 |
| |||||||||||||
Sieve Diameter(mm) | Φ500 | Φ650 | Φ850 | Φ1020 |
| |||||||||||||||||||||
Sieve Mesh Fineness | Could be changed |
| ||||||||||||||||||||||||
Overall Height(mm) | 710 | 930 | 940 | 710 | 830 | 940 | 740 | 860 | 970 | 785 | 905 | 1025
|
2. GS Liquid Vibrating Sieve
Technical Parameter
Motor | A02—6312 0.18KW |
Motor Speed | 2800r/min |
Sieve Diameter | 450mm |
Sieve Mesh Fineness | 10—300 mesh/inch |
Overall Height | 850—1250mm(could be adjusted) |
Overall Weight | 85kg |
3.GS Dry Powder Vibrating Sieve
Technical Parameter
Motor | A02—6312 0.18KW |
Motor Speed | 2800r/min |
Sieve Diameter | 450mm |
Sieve Mesh Fineness | 10—300 mesh/inch |
Overall Height | 850—1250mm(could be adjusted) |
Overall Weight | 85kg |
About Trade Term
Q-----What’s the trade term for making business with us?
A----- FOB; It’s mainly depend on client’s requirement;
About Delivery Time
Q------What’s the Delivery time after placing order ?
A------Usually it takes about 25~30 days after we received your deposit.
However, it would depend on our production line schedule(the timing clients place order)and the manufacturing process of the item.
About Payment Term
Q------What’s the Payment Term?
A------ By T/T.(40% by T/T for an order, the balance to be paid before delivery.)