Stainless steel sanitary tank manway with sight glass tank manhole cover
Negotiable
Min.Order:1
Sanitary stainless steel pipe fitting DIN 11850 Tri-clamp elbow 90 Degree C
DIN SS Sanitary Stainless Steel Welding Pipe Fittings Union Set
Stainless Steel Decoration Malleable Iron Fittings Sockets Long Double Male Thread Pipe Nipple 6\
Stainless Steel Male Female Elbow 90 Degree Pipe Fitting Elbow Screwed Tee Pipe Fitting
High quality ss sanitary flange 1 1/4 inch 3 inch pipe flange
DIN DN80 Stainless steel Welding Pipe Fitting Flange Plate Flange
Product Name: | Stainless steel sanitary tank manway with sight glass tank manhole cover | |||||||||||||||||
Valve Body Material: | 1.4404/1.4301, SS304/SS316L(Forged) | |||||||||||||||||
Seal Material: | EPDM (standard) | |||||||||||||||||
Surface Finishing | RA 0.5 to 0.8 um | |||||||||||||||||
Pressure | 5.0 Bar | |||||||||||||||||
Max. Working Tem.: | 120 degree C | |||||||||||||||||
Availably Size: | 200, 220, 300, 350, 400, 430, 450, 500, 600 | |||||||||||||||||
Features | Outward Opening Manhole Cover | |||||||||||||||||
PED 2014/68/EU | ||||||||||||||||||
Spanner type Handle, Hand Wheel Handle | ||||||||||||||||||
Options | Gasket: EPDM, silicone or Viton | |||||||||||||||||
Height: 100,120,150 | ||||||||||||||||||
Certificate: | PED 2014/68/EU |
Q: DO YOU HAVE MILL TEST CERTIFICATE? | ||||||||||||
Yes, Each order is traceable by Material certificate EN10204 3.1, and we also can offer pressure testing report, roughness test report if Client need. | ||||||||||||
Q: DO YOU HAVE PRODUCT WARRANTY | ||||||||||||
Yes,12 months warranty. 100% inspection on finished products before dispatch. Inferior products can be returned or replaced.Repair parts is supplied for replacement. | ||||||||||||
Q: WHAT'S THE MOQ? | ||||||||||||
No MOQ for standard products. Customized products can be discussed. | ||||||||||||
Q: MAY I HAVE FREE SAMPLES? | ||||||||||||
Free samples can be provided for starting cooperation, Freight is collected by Client. | ||||||||||||
Q: HOW LONG IS THE DELIVERY TIME? | ||||||||||||
Standard item are in stocked--Normally 3-5 days. Bulk order usually takes about 20-25 days. | ||||||||||||
Q: WHY WOULD I CHOOSE YOU? | ||||||||||||
1.Hard-working labor worker and advanced machine ensure large production capacity. It will give our clients fast delivery time. | ||||||||||||
2. Professional engineer and designer ensure the product parameter is well manufatcured and every month, we will have new products to help our client's enlarge market. | ||||||||||||
3. 100% inspection on finished products before dispatch, give our clients good quality products | ||||||||||||
4. High effective sales team quick response to any quote and complaint. |
Factory Square Meter | 3000 m3 | Workshop Equipment | 10--Mazak CNC Machine | ||||
Factory Square Meter | >2000 m3 | 6--HEADMAN CNC Machine | |||||
1--of automatic CNC center | |||||||
Number of employees | 105 Workers + 10 officers | 4--plain lathe | |||||
Number of Engineers | 2 designers +1 CAD drawers | 4--Press Machine | |||||
Number of Inspectors | Raw Material (3) | 3--bending Machine | |||||
Finish Product (5) | 2--Cutting Machine | ||||||
Testing Equipment | 2--Pressure Testing Machine | 2-- Chamfering Machine | |||||
1--Surface roughness device | 10--Polishing Machine | ||||||
2--Spectro Instrument Gun | 2--Laser marking Machine |