MedFuture Multichannel chemical pharma filling equipment special mini low flow rate peristaltic pump
Negotiable
Min.Order:1
Touch Screen Dispensing Peristaltic Pump
Product Composition and Flow Rate Range:
Touch Screen Dispensing Peristaltic Pump |
Pump Head & Flow Rate |
||||||||
|
YZ1515x |
ZN15 |
YZ2515x |
ZN25 |
DG1~12 (6) |
DG1~12 (10) |
|||
Model |
Tubing
Drive& Speed |
13# 14# 19# 16#25# 17# 18# |
15#24# |
0.5*'0.8,1*1,2*1,2.4*0.8, 3*1 |
|||||
MPP-100TD |
100TD |
0.1~100 rpm |
0. 007~380ml/min |
0. 17~290 ml/min |
0.0015-42.17 ml/min per channel |
0.0015~32 ml/min per channel |
Drive Technical Parameters
Drive |
100TD |
300TD |
600TD |
600TD |
Flow Rate Range |
0.0015~ 380 ml/min |
0.0015~ 1140 ml/min |
0.0015~ 2280 ml/min |
2.1~ 12000 ml/min |
Speed Range |
0. 1~100 rpm |
0. 1~300 rpm |
0. 1~600rpm |
30~600 rpm |
Speed Resolution |
0. l rpm |
l rpm |
||
Flow Rate Accuracy |
<±0.5% |
|||
Back Suction Angle |
10°~720° |
|||
Numbers of Dispensing |
0~9999T |
|||
Dispensing Time |
0. ls~9999min |
|||
Stop Time |
0. ls~9999min |
|||
Control Method |
Digital knob |
|||
Display |
LCD screen |
|||
Communication Interface |
RS232/RS485 support MODBUS protocol (RTU mode) |
|||
Ambient Temperature |
0~40℃ |
|||
Relative Humidity |
< 80% |
|||
IP Rate |
lP31 |
|||
Power Supply |
AC110V/220V±10% ,50/60Hz |
|||
Consumption |
<22W |
<35w |
<50W |
<300W |
External Size (W*D*H) mm |
212*135*240 |
264*177*153 |
||
Drive Wight (Kg) |
3.98 |
4.3 |
4.8 |
21 |
Why choose Medfuture China?
We are the professional laboratory and medical equipment supplier in China. We offer OEM and ODM service to our clients.
Would Medfuture China send product samples to customer?
We could send product samples to clients, but the sample product and the freight are charged.
What payment term does Medfuture China accept?
We accept T/T, L/C, Western Union and some of other payment methods. Usually, we prefer 100%T/T in advance, for special order, 40% of the total amount would be paid when place order, and the rest would be paid before shipment.
How long is the lead time?
7-14 preparation days are needed after receiving prepayment. Shipment period varies according the different destination, usually is 20-50 days. If it is urgent, air shipment or express delivery like TNT and DHL will be recommended.
Which port in China is the port of shipment?
Qingdao (Shandong) port (special requirement could be discussed)
How is the package of the product?
The equipment would be wrapped by soft materials to avoid vibration and would be packaged by wooden or cartoon boxes with water-proof plastic wrapper.
How is the inspection process before delivery?
Finished products will be inspected by our QC staff firstly, then will be checked by project manager. We also accepted third party inspection that arranged by clients.