Oil exploration water well mine drilling rig equipment price
Negotiable
Min.Order:1
Shandong Hengwang Group Co., Ltd.
Oil exploration drilling rig
1.The Oil exploration drilling rig can achieve different drilling methods, such as mud drilling, air drilling, air hammer drilling and so on, and adapt to different stratum environment.
2.Drilling mud can reach a depth of 40-60 meters, while air drilling or air hammer drilling can reach a depth of 30-40 meters.
3.In mountainous areas, where ordinary rigs are hard to work. Our this type mountainous drilling machine ,it is easy to move and drill. Easy disassembly ,can be disassemble to carring into the mountain by single man !
4.It can be equipped with pneumatic air compressor to drill rock in mountainous area to prospecting the coal and oil.
5.If you can equip yourself with an air compressor, we can deduct the price of an air compressor and gasoline engine for you.Please let us know!
Oil exploration drilling rig Specification | ||||||||
Drilling method | Air shock drilling | |||||||
Drilling hole diameter | 60-160mm | |||||||
Drilling depth | 60M | |||||||
Pipe | f60 | |||||||
One-time drilling length | 3000MM | |||||||
Power head | ||||||||
Rated torque (N.m) | 800-900 | |||||||
Drilling speed range (r/min) | 0-135 | |||||||
Drilling machine pressure and lifting function | ||||||||
Feed pressure (N) | 5500-6000 | |||||||
Drilling tool lifting power (kN) | 12-14 | |||||||
Maximum lifting speed of drilling tools (m/s) | 0.71-0.81 | |||||||
Engine power (hp) / speed (r/min) | 27/3600 | |||||||
Hydraulic system | ||||||||
Flow (L/min) | 0-60 | |||||||
Working pressure (Mpa) | 20 | |||||||
Air compressor unit | ||||||||
Working pressure (Mpa) | 0.8 | |||||||
Air volume (m3/min) | 3.5 | |||||||
Engine power (hp) / speed (r/min) | 35/3600 | |||||||
Weight and size | ||||||||
Total weight(rig) | 440kg | |||||||
Overrall diamensions | 2100*1900*1600mm |
Details of this type Oil exploration drilling rig
Using different media, oil exploration drilling rig can achieve different drilling methods, such as mud drilling, air drilling, air hammer drilling and so on, and adapt to different stratum environment. Drilling mud can reach a depth of 40-60 meters, while air drilling or air hammer drilling can reach a depth of 30-40 meters.
The main parts include assembling drawworks, winches, gearboxes, revolving, pulleys, powertrain, and different configurations, such as mud drilling, air hammer drilling and air drilling.
Drive gear box, easy to operate and repair, low labor intensity. On the basis of the drilling engine, it is easy to move and drill. The self-help winch can improve the drill rod and drill. The man pulled down.
A 27 HP diesel engine or a 35 HP gasoline engine provides a power rig. The engine adopts the method of stepless speed regulation. So it is unnecessary to stop or start the engine often in drilling. The performance is good, the efficiency is high, the labor intensity is low. The rig meets the safety requirements.
Oil exploration drilling rig Configuration
NO. | Part Name | SPEC. | UNIT | QUANTITY | Remarks | |||
1 | Screw compressor | 3.8 M3/MIN(Imported) | set | 1 | Contain a set of shelves | |||
2 | Air compressor's engine | 35 Hp /Kohler gasoline engine(Imported) | set | 1 | Contain a set of shelves & a set of accessories | |||
3 | Host engine | 27 Hp /Kohler gasoline engine(Imported) | set | 1 | Contain a set of shelves & a set of accessories | |||
4 | Oil pump | Variable pump(Imported) | set | 1 | Belonging to the mainframe rig | |||
5 | Operation valve | Proportional valve(Imported) | set | 1 | Belonging to the mainframe rig | |||
6 | Mainframe drill tower | set | 1 | It contains hydraulic power, fuel tank, oil pump, motor, rack, pedestal, derrick assembly, positioning sleeve and so on. | ||||
7 | Air cooled radiator | set | 1 | |||||
8 | Air tube | 38mm | m | 20 | ||||
9 | Circular drill rod | 60mm*1.5m | number | 20 | Including a host connector and an impact connector. | |||
10 | Impactor | 70mm | set | 1 | ||||
11 | DTH Bits | 75mm | set | 1 | ||||
12 | Three wing scraper bit | 75mm | set | 1 | Special-purpose for drilling soils | |||
13 | Battery | 36a | set | 2 | ||||
14 | Trigonometric belt | 2540 | set | 2 | ||||
15 | Trigonometric belt | 1400 | set | 2 | ||||
16 | Accessory | 3 kinds quick connection (each have two), 2 thread joints, 2 barbed joints, 10 pins. | ||||||
17 | Steel hose | 2 m | number | 1 | ||||
18 | Tool | set | 1 | Fork, Guan Qian, grease gun, pliers, screwdriver, battery line two. | ||||
19 | Vulnerable parts | set | 1 | Oil seal, seal ring, combination pad |
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
KQD150 Air DTH water well bore hole drilling rig DTH portable borehole water well drilling machine rigs