Forestry Machinery Wet Tree Branch Mobile Wood Chipper
Negotiable
Min.Order:1
40HP Diesel Wood Chipper
Product Description
40HP Main Specifications |
||
Engine |
Changchai 490 |
|
Type |
vertical,water cooled,4-stroke,direct injection |
|
No.of cylinders |
4 |
|
Bore*Stroke |
80*90 mm |
|
Rated power/rev. |
29/3000 kw/r/min |
|
Min.fuel consumption |
Max.247 g/kw.h |
|
Total displacement |
1.809 L |
|
Starting type |
electric start |
|
Chipper capacity (diameter) |
8 inch |
|
Feeding system |
full hydraulic (forward, stop and reverse adjustable) |
|
Rotor plate size |
60 cm |
|
Rotor plate weight |
85kg |
|
Knives number |
1 stationary knife; 2 rotor knives |
|
Dimensions (to hopper discharge) |
1700*1550*1400MM |
|
Feed hopper inner opening |
200*220 mm |
|
Discharge hood height |
200 cm |
|
Rated rotary speed |
1200 rpm |
|
Total Weight |
700 KG |
|
Working efficiency |
8-9 m3/h |
|
Features |
||
Trailer Mounted Wood chipper, complete automatic hydraulic feeding roller, 3 Bladed, 8" Diameter Capacity, Powered by 40 hp 4 cylinders Electric start diesel engine, Equipped with turning lights, easy discharge hood, 2" Ball Hitch & Safety Chains and leaf spring on the axle. |
The details of wood chipper
Certifications
Related Products
3 Ton Mini Dumper 5 Ton Site Dumper 10Ton Heavy Duty Dumper
Tractor PTO Wood Chipper 40HP Diesel Wood Chipper 50HP Diesel Wood Chipper
Packaging & Shipping
FAQ
1.How can I place order?1.How can I place order?
A: You can contact us by email about your order details, or place order on line.
2.How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T or start order from Alibaba trade assurance
3. Are you factory supplier?
A: Yes, we are real factory supplier for over10years, own a super technical team to serve adjusting design for customers
4. How do you take care when your clients received defective products?
A: replacement. If there are some defective items,
we usually credit to our customer or replace in next shipment.
5.How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection.
We check the goods when they go into next step production procedure.
6. What's the order procedure?
A: First we discuss order details, production details by email or TM.Then we issue you a PI for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production.After we get the deposit, we start to process the order.We usually need 7-15 days if we don't have the items in stock.Before production has been finished,we will contact you for shipment details, and the balance payment.After payment has been settled, we start to prepare the shipment for you.
More details please ask us online or send inquiry to us,we will answer first time.
Our Customer
Contact Us