4wd Construction stone sand transporter dumper 7 ton site dumper truck FCY70
Specification of FCY70 Construciion mining dumper | ||||
NO. | Item | Specifications | ||
1. | Payload | 7000kg | ||
2. | Operating weight | 4550 kg | ||
3. | Hopper capacity | 3.5m3 | ||
4. | Maximum speed | 25 km/h | ||
5. | Handbrake available on grade | 18% | ||
6. | Max grade ability | 251% | ||
7. | Distance of road after brake | ≤2.5m with load and speed 10km/h | ||
8. | Minimum turn radius | 4 m | ||
9. | Ground clearance | 248 mm | ||
10. | Noise level | ≤102 db(A) | ||
11. | Loading discharge angle | 48.40 | ||
12. | Time of discharge | 6s | ||
13. | Hydraulic pressure | 16 Mpa | ||
14. | Wheel base | 2200 mm | ||
15. | Wheel tread | 1580 mm | ||
16. | Engine power | 60KW | ||
17. | Dimensions (LxWxH) | 5250x2250x2700 mm | ||
18. | Engine | 60KW YTO water cooling diesel engien | ||
19. | Bore x stroke piston | 100 x 102 mm | ||
20. | Power | 60KW | ||
21. | Speed | 2400 R/Min | ||
22. | Max t | 120@2100v/p | ||
23. | Weight | 350 kg | ||
24. | Fuel consumption | 248 g/kWh | ||
25. | Tyre | 20.5/70-16 |
1.How can I place order?1.How can I place order? A: You can contact us by email about your order details, or place order on line.
2.How can I pay you? A: After you confirm our PI, we will request you to pay. T/T or start order from Alibaba trade assurance
3.Are you factory supplier? A: Yes, we are real factory supplier for over10years, own a super technical team to serve adjusting design for customers
4.How many tons site dumper do you produce ? A:We are specilized in producing site dumper cover 1ton to 10tons. Model:FCY10, FCY20, FCY30, FCY50, FCY70, FCY100.
5. Which brand engine do you have for site dumpers? A:We company choose
good quality engine for site dumpers, Changchai, Xichai, Weichai Power engine / cummins engine/ Deutz diesel engine and so on optional.
good quality engine for site dumpers, Changchai, Xichai, Weichai Power engine / cummins engine/ Deutz diesel engine and so on optional.
6. What's the order procedure? A: First we discuss order details, production details by email or TM.Then we issue you a PI for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production.After we get the deposit, we start to process the order.We usually need 7-15 days if we don't have the items in stock.Before production has been finished,we will contact you for shipment details, and the balance payment.After payment has been settled, we start to prepare the shipment for you. More details please ask us online or send inquiry to us,we will answer first time.