S2ESL105 Turbocharger 167085R 467085 104-5857 0R6744 1045857 1080213R Turbo Charger for Caterpillar Earth Moving 3116 3126
Negotiable
Min.Order:1
Descripttion:
SKU | a865009 |
GW | 12kg |
Part Number | 167085 |
Previous Version | 167085R, 467085 |
OE number | 104-5857, 0R6744, 1045857, 1080213R |
Description | 938F Loader |
CHRA | 167086 (167086R, 167637, 167637R, 178150, 178150R, 178160, 178160R, 467086, 467637, 478150, 478160)(0R6747, 0R6919, 100-6916, 1006916, 105-5064, 1055064, 115-5064, 1155064) |
Turbo Model | S2ESL105, S2ESL-105 |
Engine | 3116T |
Fuel | Diesel |
KW | 180 HP |
Asphalt Paver | AP-1000 |
Compactor Paver | CB-634C, CP-563C, CS-563C, CS-583C |
Machine Engine | 3116, 3126 |
Industrial Engine | 3116 |
Pipelayer | 561M |
Track-Type Loader | 953C |
Track-Type Tractor | D5M, D6M |
Wheel-Type Loader | 938F |
S/N | 98Z16010-UP, 98Z16285-20238; 98Z20240-20267, 98Z20223-20267, 98Z15855-20297, 98Z5104-7003, 4TF19620-32094, 4TF23390-UP |
Bearing Housing | 166440 (166431, 167634)(Oil Cooled) |
Turbine Wheel | 167423 (4P2755)(Ind. 69.59 mm, Exd. 60.6 mm, Trm 10.94, 10 Blades)(1100-016-145B) |
Comp. Wheel | 166384 (1006764)(Ind. 51.93 mm, Exd. 75. mm, Trm 7.33, 7+7 Blades, Superback) |
Back plate | 166537 (1169548)(1252202300) |
Heat shield Number | 194149 (7C5856) |
Repair Kit | 318379 (5000030122) |
Turbine Housing | 167360 (1051977) |
Compressor Cover | 167098 (1055069) |
for Caterpillar Earth Moving with 3116, 3126 Engine
Q1. Where is your company?
A: We are located in Fengcheng City Erlongshan Industrial Park, Liaoning Province, China(Mainland)
Q2. What is your terms of packing?
A: Generally, we pack our goods in plastic bags and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.
Q3. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We’ll show you the photos of the products and packages before you pay the balance.
Q4. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q5. How about your delivery time?
A: Generally, it will take 7 to 15 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q6. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q7. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q8. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
Q9: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers’ benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from