OD 23.5mm 6063 Aluminum Tube T5 Customized Extruded Aluminum Tubes ZHONGLIAN Factory
Negotiable
Min.Order:1
6063 T5 Aluminum Square Tube 300mm Aluminum Alloy Tubing Made For Decoration
ZHONGLIAN Factory Hot Selling 6063 Aluminum Alloy U Channel Tube Various Sizes Existed Mold
Mill Finished Anodized Aluminum Tube Pipe Colorful Aluminum Tube From ZHONGLIAN Aluminum Profiles
ZHONGLIAN 300*300*4.5 mm Extruded Square Aluminum Tubes with Powder Coating
3003 Aluminum Tube Pipe Zhonglian Factory Customized Aluminium Products With Existed Molds
Aluminum Alloy Tube Square 6061 6063 For Industrial And Architectural Area By ZHONGLIAN
Product Name | Aluminum Square Tube |
Brand Name | ZHL/ YALIAN/ PAILIAN |
Material | Our major material is AA6063,6061,6463.we also can make AA6082, 6005, 2024, 2014, 7075 etc. |
Temper | T3-T8 |
Thickness | General profiles thickness: 0.8 - 5.0 mm ,Anodized protection thickness: 8 - 25 um, Powder coating color thickness: 40 - 120 um. |
Length | General Loading Length is 3m/6m. Special length can customized. |
Shape | Customized |
Surface Treatment | mill, anodized, powder coated, electrophoresis, wood grain, timber, PVDF paint, polish, brushed |
Color | Metal silver, champagne, black, white, mirror, customized request available |
Application | Windows And Doors, Curtain Walls, Glass Wall, Furniture, Ceiling, Kitchen, LED Strip, Transportation Rail, Vehicles, Motor Housing, Machine, Tent, Solar. Industrial Profile, Decoration Profile |
Machining | CNC, Drilling, Milling, Cutting, Welding, Bending, Assembling |
MOQ | General Profile 500kgs.Big profile 1ton-3tons. |
Production Capacity | 5000 tons monthly, 60000 tons annually. |
Certificate And Standard | 1) ISO9001-2008/ISO 9001:2008; 2) CQM Certification; 3) SGS, CE, BV, JIS, AS, NZS, QUALICOAT, QUOLANOD available |
Guarantee | 15 years for the surface treatment indoor using |
Packing Details | Inside : packed with plastic film to protect each piece. Outside: Wrap to be bundles by waterproof craft paper or EPE film. Customized requesti available |
Delivery | Die Developing and Sample testing: 12-18 days/Product Production 20-30days. |
FOB Port | Shenzhen/Guangzhou/Foshan |
Payment Terms | T/T 30% for deposit, balance before delivery. |
Settlement Terms | Charge by gross weight. |