2KW Vertical Axis wind Turbine Generator 24V 48V 96V VAWT For Sale
Negotiable
Min.Order:1
Vertical axis wind power generator 2kw 24V/48V/96V vertical wind turbine
Description
1. Low start up wind speed; beautiful appearance, low vibration operation, low noise.
2. Being installed by human design and easy for installation, maintenance and repair.
3. Being molded through precise injection with new process, together with the optimized design of aerodynamic contour and structure, our wind turbine blades have such advantages:high utilization of wind energy which contributes to the annual energy output.
4. Our generators, adopting patented permanent magnet rotor alternator, with a special kind of stator design. efficiently decrease resistance torque of the generators
Product parameter
Rated power |
2kw |
Maximum power |
2.3kw |
Rated voltage |
48/96V |
Start-up wind speed |
2.0m/s |
Rated wind speed |
12m/s |
Survival wind speed |
50m/s |
Top net weight |
145Kg |
Wheel diameter |
2.2m |
wheel height |
2.6m |
Number of blades |
5 |
Blades material |
reinforced glass fiber |
Generator |
three phase ac permanent magnet generator |
Magnet |
NdFeB |
Generator case |
aluminum alloy |
Control system |
electronic magnet |
Speed regulation |
auto windward |
Working temperature |
-40-80℃ |
Picture
Drawing
Installation
1. Assemble the blade: Align the holes of wind wheel bracket and the blade, cover the bracket bolt with flat washer, then put it through the hole of the wind blade, tighten the nut. So does the other blades
2. The installation sequence of the wind generators can follow the steps as the pictures.
2-1. Place the steel bracket on the ground; block up the flange joint to 1.3m.
2-2. Align the wind generator flange to the tower flange. Cut away insulating layer of current transmission wire end (which are to be connected with controller) for 10mm, then short circuit the exposed copper wires (screwed together)
2-3. Fit the flange bolt with flat washer,make its head above, bolt thread below, put it through the appropriate hole of the flange base. And then connect it to the tower flange. sheath the flat washer, spring washer in the bolt thread, and finally tighten the nut in the flange bolt wire with a wrench. So does the other blots, flat washers, spring washers ,nuts and so on. Tightening force can refer to pic-2
3. Mount the bracket on the wheel hub, cover it with the clamp, fit the stainless steel bolts with spring washer, flat washer , and then put it through the hole of the hub, tighten the bolts.