Trampoline Park Activities Park Children Indoor Trampoline Parks OL-BC019
Negotiable
Min.Order:1
Zhejiang Oule Play Equipment Co., Ltd.
Product Information
Product Name | Trampoline Park Activities Park Children Indoor Trampoline Parks OL-BC019 | Model No. | OL-BC019 |
Size L*W*H | 3150*1660*500cm | Packing volume | 128cbm |
Material | 1. Steel Framed Structure 1). Upright structure of galvanized steel pipe 100*100*2.0mm; 2). "T" shaped structure of galvanized steel pipe 100*50*2.5mm;
3). "A" shaped structure of galvanized steel pipe 100*50*2.5mm;
4). Enhanced connecting structure of galvanized steel pipe 40*40*2.0mm.
2. Trampoline Mats
1). PP for normal trampoline beds (distance between each spring: 130mm); 2). Poly-amide yarns (nylon yarns) for gymnastic trampoline beds (distance between each spring: 110mm);
3). Size: 1760*1760mm of common trampoline beds; 4260*2130mm of gymnastic trampoline beds.
3. Safety Padding
Safety paddings are made from 0.46mm thick matt PVC leather plus 11mm thick XPE sponge. 4. Stiffeners and Springs
1). 40*40mm of galvanized steel for enclosure (safety net). 3.25*180mm of carbon steel wire spring for securing the common trampoline beds; 2). 3.25*260mm of carbon steel wire springs for securing the gymnastic trampoline beds (4.0*265mm of piano wire spring will be used in the four corners of the beds);
3). Other accessories like screws are all stainless.
|
||
Apply for | Amusement park, indoor themed park, super mall, warehouse, etc. | Theme &design | Customized ODM and OEM ,design for you for free with your layout. |
Trampoline composition | Jumping mat,foam pad ,tubes and springs | Warranty |
1.Galvanized pipe constrcution :5 years 2.Springs : 1year ( you need to check every month ) 3.Trampoline mats and soft pad : 2 year |
Delivery Time | For one 20GP 10-15 days, for one 40HQ 15-20 days. | Installation | Provide specific installation instruction or supply Professional installation team |
Oule Play Feedback&Certification
One-stop Sourcing
One-Stop Sourcing
Q1: Can you make a design according to my area?
A1: Yes, of course, as long as you tell me your design requirement and then we can make it.
Q2: How long for production and shipping?
A2: The production time is according to your order quantity, normally it takes around 7-15days after received the deposit.
The shipping time is according to your nearest shipping port, like Bangkok in Thailand, just 8days via sea.
Q3: Do you have any guide to install it?
A3: Yes, we can afford you CAD plan and detailed installation instrcution for fixing.
Q4: How can I pay for it?
A4: Pay by T/T (Wire Transfer), Western Union or MoneyGram, PayPal, Credit Card. 30%-50% deposit, balance after finishing production, before shipment.
Q5: Is there special requirements for the floor ?
A5: there is no special requirements, we can make the playground according the floor conditions.
For these questions, why not send us inquiry directly?
Welcome to " Send " Email to us at any time!