Product Description
Product Name | Outdoor fitness equipment pull and push chair OL-ST007 | Model No. | OL-ST007 | ||
Size L*W*H | 106*55*137cm | Packing volume | 0.5cbm | ||
Material | Plastic parts: Plastic parts of our products are manufactured by rotational moulding of LLDPE imported from Samsung corporation in South Korea. Iron parts: galvanized steel pipes, wall thickness of 2.2 mm conforming to the National standard GB/T3091-2001. Deck, Stair, Bridge Etc.: steel, covered with anti-skid rubber or PVC Ring, Clamps: Alumnium Screws: Stainless steel AISI 304 | ||||
Color | Can be choiced | Standard | TUV or NSCC | ||
Life Time | 5-8 years with good maintenance | Warranty | 1 year Free warranty and lifetime maintenance | ||
Advantage | A. Automatic laser cutting and robot welding technology applied to steel parts production procedure. B. Anti-UV, Anti-static, Anti-skid and Anti-crack C. Security and Environmental friendly. Updated patented product by using new energy. | ||||
Delivery Time | For one 20GP 10-15 days, for one 40HQ 15-20 days. | Installation | Professional CAD instruction or arrange professional staff install |
Packing & Delivery
To better ensure the safety of your goods, professional, environmentally friendly, convenient and efficient packaging services will be provided.
Company Profie
Certifications
FAQ
Q1: Can you make a design according to my area?
A1: Yes, of course, as long as you tell me your design requirement and then we can make it.
Q2: How long for production and shipping?
A2: The production time is according to your order quantity, normally it takes around 7-15days after received the deposit.
The shipping time is according to your nearest shipping port, like Bangkok in Thailand, just 8days via sea.
Q3: Do you have any guide to install it?
A3: Yes, we can afford you CAD plan and detailed installation instrcution for fixing.
Q4: How can I pay for it?
A4: Pay by T/T (Wire Transfer), Western Union or MoneyGram, PayPal, Credit Card. 30%-50% deposit, balance after finishing
production, before shipment.
Q5: Is there special requirements for the floor ?
A5: there is no special requirements, we can make the playground according the floor conditions.
For these questions, why not send us inquiry directly?
Welcome to " Send " Email to us at any time!
A1: Yes, of course, as long as you tell me your design requirement and then we can make it.
Q2: How long for production and shipping?
A2: The production time is according to your order quantity, normally it takes around 7-15days after received the deposit.
The shipping time is according to your nearest shipping port, like Bangkok in Thailand, just 8days via sea.
Q3: Do you have any guide to install it?
A3: Yes, we can afford you CAD plan and detailed installation instrcution for fixing.
Q4: How can I pay for it?
A4: Pay by T/T (Wire Transfer), Western Union or MoneyGram, PayPal, Credit Card. 30%-50% deposit, balance after finishing
production, before shipment.
Q5: Is there special requirements for the floor ?
A5: there is no special requirements, we can make the playground according the floor conditions.
For these questions, why not send us inquiry directly?
Welcome to " Send " Email to us at any time!
Real Case
More product
Outdoor playground
Outdoor fitness
Indoor playground
Indoor trampoline
Indoor play
Outdoor spring rider