Cheap Factory Price Stadium Mental Construction Projects Light Weight Large Span Quick Build Steel Structure Building
Negotiable
Min.Order:1
Hot Sale Low Cost Warehouse Prefab Ss4oo Prefabricated Storage Steel Structure Building
Cheap Light Metal Warehouse Restuarant Poultry Farm House Steel Structure Building
Hot Customized Metal Sheds Economic Prefab Shed Warehouse For Sale Steel Structure Building
Good Quality Metal Workshop Fabric Modular Warehouse Custom Prefab Steel Structure Building
main steel frame | H section steel beam and columns, painted or galvanized, galvanized C section or steel pipe |
Secondary frame | hot dip galvanized C purlin , steel bracing , tie bar , knee brace , edge cover etc. |
Roof panel | EPS sandwich panel,glass fiber sandwich panel,rock wool sandwich panel,and PU sandwich panel or steel sheet |
Wall panel | Sandwich Panel or Corrugated Steel Sheet |
Tie Rod | Circular Steel Tube |
Brace | Round Bar |
Knee Brace | Angle Steel |
Roof Gutter | Color Steel Sheet |
Drawing | We can make the design and quotation according to your require or your drawing |
Certification | ISO9001:2000,CE. |
HI,Dear friend,Pls. Attention
Steel structure building is one kind of product which can be design as per every proples' different need.
so, if you found that follows example pictures is not as same as your want, even it is very different.
do not worried,
no matter which kind of building you need,prefabricated houseswarehouse
bigger, smaller or multi-storey, just tell me the data or drawing of building what you need.
we will make the exact design, quotation and rendering for you as soon as we can.
(our group have more than 10 years experience on steel structure )
Send your inquiry today .
(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the
rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile
up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.
(5) The member to the construction site, timely organization of unloading, stacking area.
(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.
Production Capacity |
Installation Contruction |
Customers Visit |
1.You are manufacture factory or trading company?
We are manufacture factory. You are welcomed to visit us at any time. In the workshop,it has a complete advanced equipment system for making steel structures and panels. So we can make sure the good quality and also the competitive price.
2.How about your quality control?
Our products have passed CE EN1090 and ISO9001:2008.
3.Can you offer design service?
Yes,we have an engineer team and can design for you according to your requirements.Architectural drawing,structure diagram,processing detail drawing and installation drawing will be made and let you confirm in different time of the project.
4.What's the delivery time?
The delivery time depends on the size and quantity of building.Generally within 30 days after receiving the payment.And partial shipment is allowed for big order.
5.Do you offer service for installation?
We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if neede.
6.How to get a quote from you?
You can contact us online or by email.If you have drawings, we can quote them according to your drawings.Or else please let us know length, width, eave height and local weather to give you an exactly quotation and drawings.
7.What's the payment term?
30% deposit and 70% balance before shipment.