Low cost design layout plans modern industrial prefabricated building steel structure factory plant workshop for buildings kit
Negotiable
Min.Order:1
High standard prefabricated light steel structure warehouse prices
china manufacturer construction design building material steel structure prefabrication warehouse
Medium and small size autocad steel frame prefab warehouse business plan
High quality cost effective durable steel frame structure prefab small warehouse drawings plans
Cheap prefab steel structure cow farm cattle shed dairy barn building
Steel Structure Building Description |
main steel frame | H section steel beam and columns, painted or galvanized, galvanized C section or steel pipe |
Secondary frame | hot dip galvanized C purlin , steel bracing , tie bar , knee brace , edge cover etc. |
Roof panel | EPS sandwich panel,glass fiber sandwich panel,rock wool sandwich panel,and PU sandwich panel or steel sheet |
Wall panel | Sandwich Panel or Corrugated Steel Sheet |
Tie Rod | Circular Steel Tube |
Brace | Round Bar |
Knee Brace | Angle Steel |
Roof Gutter | Color Steel Sheet |
Drawing | We can make the design and quotation according to your require or your drawing |
Certification | ISO9001:2000,CE. |
Completed Projects |
Design Teams |
Canglong Group has an efficient, professional and high-quality team of designers. Team members have at least 15 years of experience in steel structure projects design in this industry.
The design team of Canglong Group adopts the international mainstream design software, and carries out design analysis in strict accordance with international standards in the design process of each project. While ensuring the safety, energy saving and high efficiency of buildings, it effectively reduces the material loss and waste of the project and ensures the economic design scheme of each project.
Materials |
Packaging And Transportation |
Fixed packing, loading, transportation, unloading the matters needing attention:
(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the
rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile
up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.
(5) The member to the construction site, timely organization of unloading, stacking area.
(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.
Production Capacity |
Canglong Group is a comprehensive enterprise which integrates design, production, processing, logistics, transportation and construction in the steel structure construction industry. It has 23 production lines of various types of steel structures and plates, covering the production and processing of all materials in the steel structure construction industry. And has obtained ISO 9001 international quality management system certification, steel structure, color steel plate, integrated housing CE certification.
|
Canglong Group has three top-ranking construction teams of steel structure projects, and has obtained the qualification certificate of general contracting of steel structure construction industry issued by the state. It has completed 5603 general contracting construction projects of steel structure projects in 126 countries worldwide. And has won the unanimous praise of a wide range of customers.
Certification |
Customer Visit |
|
1.You are manufacture factory or trading company?
We are manufacture factory. You are welcomed to visit us at any time. In the workshop,it has a complete advanced equipment system for making steel structures and panels. So we can make sure the good quality and also the competitive price.
2.How about your quality control?
Our products have passed CE EN1090 and ISO9001:2008.
3.Can you offer design service?
Yes,we have an engineer team and can design for you according to your requirements.Architectural drawing,structure diagram,processing detail drawing and installation drawing will be made and let you confirm in different time of the project.
4.What's the delivery time?
The delivery time depends on the size and quantity of building.Generally within 30 days after receiving the payment.And partial shipment is allowed for big order.
5.Do you offer service for installation?
We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if neede.
6.How to get a quote from you?
You can contact us online or by email.If you have drawings, we can quote them according to your drawings.Or else please let us know length, width, eave height and local weather to give you an exactly quotation and drawings.
7.What's the payment term?
30% deposit and 70% balance before shipment.