Prefabricated Steel Structure Architectural Drawings Building
Negotiable
Min.Order:1
Cheap Steel Building Construction Portal Frame Prefabricated Iron Structure
modern design metal building construction steel structure prefabricated industrial shed construction
Gable Frame Steel Buildings Constructions Light Steel Prefabricated Roof Structure
Metal Industrial Building Constructions Light Steel Hotel Prefabricated Building
Structural Steel Prefabricated Sheds / Factory Types Portal Frame
Prefabricated steel structure architectural drawings building
Main component
1 | main steel frame |
H section steel beam and comlumns, painted or galvanized, galvanized C section or steel pipe |
2. | Secondary frame : |
hot dip galvanized C purlin , steel bracing , tie bar , knee brace , edge cover etc. |
. | Roof panel : | EPS sandwich panel , glass fiber sandwich panel , rock wool sandwich panel , and Pu sandwich panel or steel sheet |
Wall panel : | Sandwich Panel or Corrugated Steel Sheet | |
Tie Rod: | Circular Steel Tube | |
Brace: | Round Bar | |
Knee Brace: | Angle Steel | |
Roof Gutter: | Color Steel Sheet | |
Rainspout: | PVC Pipe | |
3. | Door: | Sliding Sandwich Panel Door or rolling Metal Door |
Windows: | PVC/Aluminum Alloy Window | |
Connecting: | post feet bolts, intensive bolt , intensive bolt | |
4. | Packing: | according to the pack list made by our engineer |
5. | Drawing: | We can make the design and quotation according to your require or your drawing |
Steel stucture building is a new type of building structure system . The main steel frame is formed by linking up H-section,Z-section and U-section steel components while roof and wall using a variety of sandwich panels.
1. Possesses a wide span , with either a single or multiple spans and can have a maximum span clearance distance in 36m without middle columns.
2. Low cost with unit price ranging from USD30 to USD 87 per square meter FOB according to customer's requirements.
3. Fastconstruction and easy installation
4. Has a service life of more than 50 years
5. The warehouses are also environmentally friendly , have a stable structure , are earthquake resistance, water proof , and energy saving
Product application:
widely used as industry factory building , warehouse , gymnasium, poultry shed , school and medical clinic,garage, hangar, etc.
1.Q235,Q345 H section steel structure for columns and beam
2. Pre-embedding anchor bolts for connection columns to foundation
3. Intensive bolts for connection tween columns and beams.
4. Wall/roof panel: one layer corrugated stee plate or sandwich panels
5. Windows/door . PVC, aluminium alloy , steel etc.
6. Color steel plate or galvanized steel gutters and pvs tubes for rain water
1."SteelDesignCode"(GB50017-2003)
2."Cold-formedsteelstructuretechnicalspecifications"(GB50018-2002)
3."ConstructionQualityAcceptanceofSteel"(GB50205-2001)4."TechnicalSpecificationforweldedsteelstructure"(JGJ81-2002,J218-2002)
5."TechnicalSpecificationforSteelStructuresofTallBuildings"(JGJ99-98)
1.Data for design
*Wind speed(KM/H)
*Snow load (KG/M2)
*Rain load (KG/M2)
*Earthquake load if have
*Demands for doors and windows
*Crane (if have) ,Crane span, crane lift height, max lift capacity, max wheel pressure
and min wheel pressure!
2.material quality
*Windows and doors quantity,size and location
*Roof and wall material ,sandwich panel or corrugated steel sheet (steel sheet can not heat insulation)
3.Type
*size--width,length,eaveheight and roofslope
*single slope or double slope
*single floor,double floor or multi floor
Quality control
Bolts and screws
Sandwich Panels
Corrugated Steel Sheet
skyligh panel
Appearance and internal
Packing and loading cotainer
1. How to buy your idea products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.
2.What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 30 days.
3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
4.How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
Prefabricated steel structure architectural drawings building , please click button"send"
Free Design and Quote
Quality is Our Culture
With us Your Money is Safe