Multi Story Prefabricated Steel Structure Apartments Building
Negotiable
Min.Order:1
Industrial Construction Building Steel Structure Supermarket Structural Metal Hotel
Industrial Steel Prefabricated Metal Roof Metal Building Construction Projects
Hot Rolled Steel Workshop/Warehouse/Building/Office Structure
Quickly Build Light Prefabricated Steel Structure Fabrication
Steel Structure Pre-engineered Facility Project Metal Building
Prefab Metal Light Weight Frame Structure Steel Storage Building Kits
standard labor camp house is made of light steel as steel structure and sandwich panels for wall and roof. The sandwich panels can be polystyrene, polyurethane, rock wool and fiber glass sandwich panels for insulation.
The standard prefabricated building is made by 1.8m as one modular, and components connected by bolts. The house can be assembled and disassembled more than 6 times, and the service life is more than 50 years.
The house can be used for labor camp, workers accommodation room, creation room, office, toilet room, kitchen room, warehouse, school, hotel, etc.
Characteristics:
1. Environmentally friendly, no waste produced during assemble.
2. Flexibility when fixing doors, windows and interior partitions
2. Live load capacity of roofing0.5kN/m2
3. Second floor load capacity: 150kg/m2
Main steel frame : | Steel Welded H Section or hot rolled H section (specification Q235, Q345 ) for columns and beams |
Roof panel : | EPS sandwich panel , glass fiber sandwich panel , rock wool sandwich panel , and Pu sandwich panel |
Wall panel: | Sandwich panel |
Door: | Sliding Sandwich Panel Door or rolling Metal Door |
Window: | PVC/Aluminum Alloy Window |
Connecting: |
Post feet bolts, intensive bolt , intensive bolt |
Q1. You are manufacture factory or trading company? |
Q2. Is your price competitive with other companies? A: Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost. |
Q3. Do you offer service for installation? A: We will give detailed installation drawings and video for free. And if you need, we could send engineers as installation director even a team. |
Q4. Do you accept container loading inspection? ; A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time. |
Q5. Do you offer designing service for us? A:Yes, we could design full solution drawings as your requirements. They use software such as Auto CAD, PKPM, MTS, 3D3S, etc. we will be glad to establish sincere business cooperation with you in the near future |
Q6. What is the delivery time? A: Delivery time depends on order quantities. Generally, the delivery time will be 30 days after receiving deposit. |
Q7. How can you get a quotation for your projects? quotation ASAP. Thanks for your kind cooperation. |