Prefab metal sheds and garages construction kits
Prefab metal sheds and garages construction kits
Prefab metal sheds and garages construction kits
Prefab metal sheds and garages construction kits

Prefab metal sheds and garages construction kits

Negotiable

Min.Order:1

Supply Ability:
1000 per Month
Payment Terms:
T/T Credit Card

Qingdao Director Steel Structure Co., Ltd.

Business Type: Agent
Main Products: , , ,

Product Details

Prefab metal sheds and garages construction kits

Product Description

    Steel structure building is a new type of light steel structure building system formed from a main steel framework comprised of H section,Z section and U section steel components,the roof and walls utilizing a variety of panels and other components such as windows,doors,and cranes.The light steel structure building is widely used in the construction of buildings such as warehouses,workshops,large factories,poultry feeding buildings,hangar,ect. 

 

Specifications:

Main steel frameH section steel beam and columns, painted or galvanized, galvanized c section or steel pipePrefab metal sheds and garages construction kits
Secondary frameHot dip galvanized c purlin , steel bracing , tie bar , knee brace , edge cover etc.
Roof and wall panelcorrugated steel sheet or sandwich panel (EPS,Rockwool,Fibre glass,PU)Prefab metal sheds and garages construction kits
BraceAngle,tube and round bar;painted or galvanized 
Knee braceAngle steel 
Door Sliding sandwich panel door or roller metal door
WindowPVC/aluminum alloy window
Gutter Steel material
Rain pipePVC Pipe
Edge cover 0.5mm thickness color steel sheet 
ConnectingPost feet bolts, intensive bolt 
Crane5MT, 10MT, 15MT, etc 
DrawingWe could make designs according to your requirement 

 

Advantages of light steel structure:
1) Cost saving and transportation convenient, custom design available.
2) The main beam and column are made of quality steel.
3) Steel structure makes the house resist heavy wind of 140km/h and 8-grade

earthquake.
4) Easy assembly and disassembly several times without damage.
5) Widely used in construction site, office building, dormitory etc.
6) Good environmental protection effect. Steel structure housing construction greatly reduces sand, stone and dosage of the ash. Most of the used materials are recyclable or degradable, little rubbish produced.

 

Drawings & Quotation:
1) Customized design is welcomed.As long as you like, we can design and provide drawings for you.
2) In order to give you an exactly quotation and drawings, please let us know the blow information:

  1. Dimension: Length, width, height, eave height, roof pitch, etc.

  2. Doors and windows: Dimension, quantity, position to put them.

  3. Local climate: Wind speed, snow load, floor load etc.

  4. Wall and roof material: Sandwich panel or steel sheet.

  5. Crane beam: Do you need crane beam inside the steel structure? And its capacity.

  6. Other requirements.


Engineering Design Software:
AutoCAD, PKPM, MTS, 3D3S, Tarch,Tekla Structures(Xsteel)V12.0.etc.


Payment Terms:
1) Payment: L/C or by T/T(50% T/T in advance, the balance before shipment)
2) Delivery time: 15~40 days, usually as customers' order.
3) Shipment: 20"GP, 40"GP, 40"HQ, 40"OT or in bulk.

 

Related Products

 

Prefab metal sheds and garages construction kits

Packaging & Shipping

 

Prefab metal sheds and garages construction kits 

Our Customer

Prefab metal sheds and garages construction kits 

FAQ

1.Common type of the industrial building?

Reply:Portal frame is the usual type in the industrial workshop and warehouse shed.Other

types also could be designed and manufacturer as per clients's equest.

2.What's the quality grade of the steel structure components?

Reply:Q345 is used for main steel structure,Q235 is used for secondary steel structure.

3.How about the delivery time?

Reply:Usually,within 25-60 days after the order confirmed,also depends on the fabrication

quantity.

4.How about the derust grade?

Reply:Ball blasting Sa2.5 on main steel structure

manual derust St2.0 on secondary steel structure.

5.What kind panel used for the roof and wall?

Reply: Color corrugated steel sheet and sandwich panl could be used.Sandwich panel

performs well on the heat insulation,sound insulation.Common sandwich materials are EPS,

glass wool and PU.

6.How to install it?

Reply: We will furnish you the detailed construction drawing and theconstr uctionmanual

which could help you to erect and install the building step by step.We also could send the engineer your local to help you if needed.

7.Maintenance:

Reply:Finish paint need be done after the frame installed,and do it again after 6-8 months.

So the surface willstay m ore time.

 

Contact Supplier

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Construction & Real Estate > Real Estate > Prefab Houses
Categories
Hi~