1.Construction Building Information:
Steel chicken shed project showing
Our Advantages: |
A. We have our own technical teams, so we can design, fabricate and install this steel structure workshop according to customers requirement. |
B. It's very easy to install the steel structure workshop in your there according to our installation drawings. Also, we will supply all technical support during installation and after-sale service. |
C. One stop shoping---we offer not only steel structure but also sandwich panels and all the accessories. It will ensure the perfect integration between each part. |
D. fast construction, easy installation, stable structure, earthquake proofing, energy conserving and environment protection. |
E. We have pretty good preservative treatment on this steel frame as follows,
a. Clean the steel( reach to Sa2.5 Grade, China Code), then we will spray paint: 2 layer epoxy zinc rich primer and 2 layer antirust paint( total thickness: 100-120um); Warranty period: 18-20 years under normal conditions.
b. Hot-dipped galvanized, when the thickness of parts is less than 5mm,thickness of hot-dipped gal is more than 65um; when equal to or more than 5mm, that is more than 86um. Warranty period: 45-50 years under normal conditions. |
Our factory have independent design institute and the Design qualification is the grade one .excellent design and the perfect price Beyond your imagination .If you want to a perfect warehouse and please provide to us that information wihich as follows;
Location (where will be built? ) _____country, area
2 Size: Length*width*height _____mm*_____mm*_____mm
3 wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
4 snow load (max. Snow height)
_____kn/m2, _____mm
5 anti-earthquake _____level
6 brickwall needed or not If yes, 1.2m high or 1.5m high
7 thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.
8 door quantity & size _____units, _____(width)mm*_____(height)mm
9 window quanity & size _____units, _____(width)mm*_____(height)mm
10 crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m
we are big group factory and have more than 25 years experience of steel structure workshope project The first design&Engineering Service,Excellent product and perfect Has won the praise of customers and want to cooperation with more and more friends and customer add us team .