prefabricated galvanized steel frame house
1) Main Steel: Q195, Q215, Q235, Q255, Q275, Q345, Q235, etc.
2) Column & Beam: Welded or Hot rolled H-section
3) Connection method of steel structure: welding connection or bolt connection
4) Wall & Roof: EPS, Rockwool, PU sandwich, corrugated steel sheet
5) Door: Rolled up door or Sliding door
6) Window: Plastic steel or Aluminum alloy window
7) Surface: Hot dip galvanized or painted. (More RAL color as per request)
8) Crane: 5MT, 10MT, 15MT, etc.
Material list |
|
Project sample |
6000 square meter prefabricated warehouse construction building |
Building size (m) |
Such as 100x 60 x 8m/ Customized |
Main steel structure |
|
Steel column |
H(400-800)x260x8x12, Steel Q345B/Customized |
Steel Beam |
H(800-550)x250x8x10, H550x250x8x10/Customized, Steel Q345B |
Second steel structure |
|
Roof Purlin |
C200*70*20*2.5/Customized |
Wall Purlin |
C200*70*20*2.5/Customized |
Cross Support |
20 Round Steel Bar, Steel Q235B |
Column Bracing |
20 Round Steel Bar, Steel Q235B |
Angle Brace |
L50x4 Angle Steel, Steel Q235B |
Tie Bar |
89*3, Steel Q235B |
Roof and wall panel |
|
roof panel |
50/75/100mm sandwich panel (EPS, PU, Glass wool, Rock wool) or color steel sheet |
Wall panel |
50/75/100mm sandwich panel (EPS, PU, Glass wool, Rock wool)or color steel sheet |
rolling up door |
auto-matic aluminum rolling up door/sandwich panel sliding door, sandwich panel sectional door |
Single Wing door |
sandwich panel door/aluminum hinged door |
Window |
Aluminum/PVC sliding window with single glass/double glass |
Edge Cover |
steel sheet (thickness 0.5mm) |
Fittings |
glass adhesive, self-tapping screw etc. |
Other fittings & Accessories |
|
Embedded |
M24 steel Q235, process |
Intensive bolt |
Grade 10.9 |
Ordinary bolt |
4.8S |
Gutter |
Color steel sheet, steel, stainless steel |
Water drain pipe |
PVC |
Ventilator |
Unpowered ventilator, electric monitor |
Steel frame is used more and more widely in workshops and other industrial and civil buildings. For the main frame, there are single-span and multi-span gantry light frame structures and reinforced concrete structures, compared with its unique advantages.
The steel structure is sturdy, environmentally friendly, insulated, waterproof and soundproof, and is very popular.
Successful project:
Advantages of light steel structure:
1) Cost saving and transportation convenient, custom design available
2) The main beam and column are made of quality steel
3) Steel structure makes the house resist heavy wind of 140km/h and 8-grade earthquake
4) Easy assembly and disassembly several times without damage
5) Widely used in construction site, office building, dormitory etc.
6) Good environmental protection effect. Steel structure housing construction greatly reduces sand, stone and dosage of the ash. Most of the used materials are recyclable or degradable, little rubbish produced
------------------------------------------------------------------Our partner -------------------------------------------------------------------------
Q1:Life span of the building.
Life span of the building affected by different maintenance and different environmental conditions, normally lift span of main steel structure is about 50-100 years( keep painting every one or two years). Life span of roof and wall panel is about 15-25 year, Life span of skylight is about 8-15 years.
Q2:Installation
Yes, usually we will send you the detailed installation drawing, if you need, we can provide the service of installation, supervision and training by extra. We can send our professional technical engineer to supervise installation on site overseas.
Q3:Whats the quality assurance you provided and how do you control quality ?
AEstablished a procedure to check products at all stages of the manufacturing process - raw materials, in process materials, validated or tested materials, finished goods, etc. SGS, BV and other testing are available for us. We could deal with you by Trade Assurance via Alibaba.
Q4:Can you offer designing service?
Yes, we have more than 10 design engineers. We could design full solution drawings as per your requirments. They use software: Auto CAD,PKPM, MTS, 3D3S, Tarch, Tekla Structures(Xsteel)V12.0.etc.
Q5:What is the delivery time?
Delivery time depends on order quantities. In general the delivery time to nearest seaport in China will be 30 days after receiving deposit.