Steel frame construct prefab build from china steel build structure warehouse
Negotiable
Min.Order:1
Qingdao Senwang Steel Structure Building Stock Co., Ltd.
Steel frame construct prefab build from china steel build structure warehouse
Term | Specification | |
Main Steel Frame | Column | Q235, Q355 Welded H Section Steel |
Beam | Q235, Q355 Welded H Section Steel | |
Secondary Frame | Purlin | Q235 C and Z purlin |
Knee Brace | Q235 Angle Steel | |
Tie Rod | Q235 Circular Steel Pipe | |
Brace | Q235 Round Bar | |
Vertical and horizontal Support | Q235 Angle Steel, Round Bar or Steel Pipe | |
Maintence System | Roof Panel | EPS Sandwich Panel / Glass Fiber Sandwich Panel / Rock Wool Sandwich Panel / Pu Sandwich Panel /Steel Sheet |
Wall Panel | Sandwich Panel / Corrugated Steel Sheet | |
Accessories | Window | Aluminum Alloy Window / PVC Window / Sandwich Panel Window |
Door | Sliding Sandwich Panel Door / Rolling Metal Door / Personal Door | |
Rain spout | PVC | |
Live load on Roof | In 120kg /Sqm(Colr steel panel Surrouned ) | |
Wind Resistance Grade | 12 Grades | |
Earthquale -Resistance | 8 Grades | |
Structure Usage | Up to 50 years | |
Temperature | Suitable temperature:50'C -+50'C | |
Certification | CE,SGS,ISO9001:2008.ISO4001:2004 | |
Finishing Options | Vast array of colors and textures available | |
Paint Options | Alkys paiting,two primary painting ,two finish painting (Gray paint ,red paint,white pait ,epoxy zink etc.) or Galvanized |
*Construction stage
1.supply you with detailed construction drawing to guide
2.send one engineer to your local
vide related production for your reference
*After-sale service
1.reasonable advice for usage, maintenance, technically improve
2.unique engineer be in charge of your project
3.on-site servic