Factory Workshop Building Prefab Steel Structure Warehouse Steel Structure Building
Factory Workshop Building Prefab Steel Structure Warehouse Steel Structure Building
Factory Workshop Building Prefab Steel Structure Warehouse Steel Structure Building
Factory Workshop Building Prefab Steel Structure Warehouse Steel Structure Building
Factory Workshop Building Prefab Steel Structure Warehouse Steel Structure Building

Factory Workshop Building Prefab Steel Structure Warehouse Steel Structure Building

Negotiable

Min.Order:1

Supply Ability:
1000 per Month
Payment Terms:
T/T Credit Card

Qingdao Senwang Steel Structure Building Stock Co., Ltd.

Business Type: Association
Main Products: , , ,

Product Details

Specification
Material List
Project 
Steel Structure Building
Size
According to Customer Need
Main Steel Structure Frame 
Column
Q235B, Q355B Welded H Section Steel
Beam
Q235B, Q355B Welded H Section Steel
Secondary Steel Structure Frame
Purlin
Q235B C and Z Type Steel
Knee Brace
Q235B C and Z Type Steel
Tie Tube
Q235B Circular Steel Pipe
Brace
Q235B Round Bar
Vertical and Horizontal Support
Q235B Angle Steel, Round Bar or Steel Pipe
Roof and Wall Systerm
Roof Clading
Steel Sheet or Sandwich Panel (EPS, PU, Glass Wool, Rock Wool)
Wall Clading
Steel Sheet or Sandwich Panel (EPS, PU, Glass Wool, Rock Wool)
Door
Sandwich Panel Sliding Door/Rolling Metal Door
Window
Aluminium Alloy Window/PVC Panel Window
Some information we need to know before making the price for prefab warehouse steel structure building
Location (where will be built)
_____country, area
Size: length*width*height
_____mm*_____mm*_____mm
wind load (max. wind speed)
_____kn/m2, _____km/h, _____m/s
snow load (max. snow height)
_____kn/m2, _____mm
anti-earthquake
_____level
brickwall needed or not
If yes, 1.2m high or 1.5m high
thermal insulation
If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; if not, the metal steel sheets will be ok. The cost
of the latter will be much lower than that of the former.
door quantity & size
_____units, _____(width)mm*_____(height)mm
window quanity & size
_____units, _____(width)mm*_____(height)mm
crane needed or not
If yes, _____units, max. lifting weight____tons; max. lifting height _____m
Product Description

Senwang steel frame structure warehouse

1.The steel structure of the connection method: welding connection
2. Steel structure design common norms are as follows: "Steel Design Code" (GB50017-2003) "Cold-formed steel structure technical specifications" (GB50018-2002) "Construction Quality Acceptance of Steel" (GB50205-2001) "Technical Specification for welded steel structure" (JGJ81-2002, J218-2002) "Technical Specification for Steel Structures of Tall Buildings" (JGJ99-98)
3.The characteristics of prefab warehouse steel structure building Higher reliability of steelwork Steel anti-vibration (earthquake), impact and good Steel structure for a higher degree of industrialization Steel can be assembled quickly and accurately Large steel interior space Likely to cause the sealing structure Steel corrosive Poor fire-resistant steel Recyclable steel Steel shorter duration
Major Project
Installation Procedure
Company Profile
Why Choose Us
Our advantages:
With a wide range,good quality,reasonable price and stylish design,our products are extensively used in ware-house,workshop and office living and other industries. Our products are widely recognized and trusted by users and can meet continuously changing economic and social needs.
We welcome new and old customers from all around the world to contact us for future business relationships and mutual success.
Packing & Delivery
To better ensure the safety of your goods, professional, environmentally friendly, convenient and efficient packaging services will be provided.
Packaging Details

1.Steel structure components will be in mude packaging with proper protection.
2.Sandwich panels will be covered with plastic film.
3.Bolts and other accessories will be loaded into woodern Boxes

All the structure components, panels, bolts and sorts of accessories will be well packed with standard package suitable for ocean transport and loaded into 40’HQ.
All the products are loaded at the loading site of our factory using crane and forklift byour skilled workers, who will prevent
the goods from being damaged.
Good relationship with many vessel companies to make sure the transportation smooth.
FAQ
Q1: Is your company a factory or trade company?
We are factory, so you can get the best price and competitive price.

Q2: What are your main products?
A: Our main products have steel structure,warehouse,workshop,prefab house,container house, steel poultry shed,steel car
garage,steel aircraft hangar,light steel villa,sandwich panel and other construction materials.

Q3: What’s the quality assurance you provided and how do you control quality ?
Established a procedure to check products at all stages of the manufacturing process - raw materials, in process
materials,validated or tested materials, finished goods, etc.

Q4: Do you offer guiding installation on site overseas for warehouse building?
Yes, we can provide the service of installation, supervision and training by extra. We can send our professional technical
engineer to supervise installation on site overseas.

Q5: What should the client provide before you offer a complete quotation?
A: When we receive inquiry from client, please fill purchasing intention sheet, providing us with information of warehouse
dimensions, draft drawing, layout and materials for prefabricated house. We will design the drawings and offer competitive quotation with the above information.

Q6: What kind of drawing will you provide?
A: Plan drawing, elevation drawing, sectional drawing, foundation drawing, installation drawing.

Q7: How many colors do your sandwich panels have?
A: Off-white, ivory white, blue, green , red and according to buyer's requirement.

Contact Supplier

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Minerals & Metallurgy > Steel > Steel Structures
Categories
Hi~