High&Low Pressure Combined Manifold,API 6A Plug Valves Manifold
Negotiable
Min.Order:1
High&Low pressure combined manifold
General requirements:
Be sure that all scraps have been cleaned and all seal rings are good before connecting the high and low pipeline.The union shall be assembled properly without any leakage.
The length between manifold and fluid container shall be as short as possible,and between fracturing blender truck and manifold shall have a short length as well.
Wellhead connecting requirements:
Nipple connected appropriate for 35MPa as general.
Flanged connected appropriate for high pressure of 70MPa&105MPa.All connecting joint shall be swivel joint.
Falnged connected specification:70/65,70/78,105/65,105/78
Connecting requirements for low pressure manifold:
Provided the quantity of water inlet in the side of fracturing blender truck is less than the quantity of fluid container,the manifold shall be used.
If the operation discharge is above 2.5 M3/min,3 pipelines of 4 inch is needed at least.
If the operation discharge is above 3.5 M3/min,4 pipelines of 4 inch is needed at least.
If the operation discharge is above 5 M3/min,6 pipelines of 4 inch is needed at least.
Connecting requirement for high pressure manifold:
When the safe chain or check cable is used in the manifold,the union near the manifold set shall be excepted shall less than 0.5 M,the inpending length shall less than 5 M.
All high pressure connect shall be flexible.
A check valve or plug valve must be assembled between the pipelines connected to the wellhead.
Honorary Certificate
Our products have been ISO9001 certified and attained API 6A,6D,API 7,7K,and API 16A&16C approvals of American Pertroleum Insitute.All products are fully designed and manufactured in accordance with API,ANSI,GB(national standards)and SY(industry standards)standards.