XY-8 straight hole and inclined hole Drilling rig for deep hole, general tower mine drilling rig
Negotiable
Min.Order:1
Luohe Orange Mechanical Equipment Co., Ltd.
Drilling angel | 0-360° |
Electric motor | Y280S-4 /75KW |
Diesel engine | YC6A240-33/ 177KW |
Spindle | 96mm |
Forward speed | 74/106/150/208/300/431 |
Reserve speed | 110rpm |
Forward speed | 110/157/222/309/445/640/905/1256 |
Reserve speed | 74rpm |
Max.torque of spindle | 8000nm |
Spindle stroke | 800mm |
Max.lifting force of spindle | 180kn |
Max.thrust of spindle | 110kn |
Type | Planetary gear drive, hand brake |
Wire rope caliber | 21.5mm(6X19) |
Drum capacity for rope | 120m |
Max.lifting force(single rope) | 60kn |
Power unit core speed 1480rpm(m/s) | 0.48/0.68/0.96/1.34/1.96/2.81/3.96/5.51 |
Power unit core speed 2300rpm(m/s) | 0.71/1.01/1.42/1.99/2.91/4.17/5.88/8.19 |
Transmission | Shanxi Fast Gear 8JS118 transmission and ancillary clutch, safe and reliable. |
Oil pump type/ model | gear oil pump/ CB-32 |
core speed | 2500r/min |
Displacement | 32 ml/r |
Work pressure | 20mpa |
ure | 25mpa |
Direction of rotation | Right(see from shaft end) |
Work core speed | 700-1800r/min |
Single rope compensational speed | 3-8m/s |
Single rope compensational load | 45kn |
Form | skids type(with sliding base) |
Rig backward stroke | 530mm |
Dimensions(L*W*H) | 3800*1500*2460mm |
Rig weight | 6500kg |