Copper Cathode Production Line FRP Electrolytic Cells
Negotiable
Min.Order:1
Polymer concrete electrolytic cell provides tailor-made, environmentally sound and optimized solutions for copper electro-refining / electro-winning plants. Crane positioning pin, acid mist pipelines, and anode mortise are embedded with cells.
Through modifying resin molecular structure to make its expansion co-efficient close to SiO2, we make cell components being an integration by cold isostatic pressing for anti-corrosion, isolation and long service life.
1. Main quality indicators:titanium substrate, precious metal ratio, accelerated life, coating binding force to the titanium substrate(coating adhesion)
2. Advanced technology & equipment, abundant experiences and skilled workers, during the production of Titanium Anode, each process must be strictly supervised and tested.
3. Own R&D, Production and Sales department, Elade always struggling to supply the product with the most excellent quality and the most favorable price and supply the most efficient service.
4. Each production process is according to the ISO standard to sure the specifications and performance are qualified.
5. Elade accept the third party certificate if needed.
compressive strength | 116MPa | Density | 2244 kg/m3 |
bending strength | 24.3MPa | coefficient of thermal expansion(room temperature ~ 100℃) | 1.89×10-5/℃ |
bending modulus | 20.6GPa | Bath dimension error | less than 3mm |
surface resistivity | 7.27×1012Ω | opposite angles error | less than 5mm |
heat conductivity coefficient | 1.49 w/m·k | vertical error | less than 5mm |
Average specific heat capacity | 960 J/Kg·k |
Q: Are you trading company or manufacturer ?
A: We are Manufacturer.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.