Guangzhou Apex Building Material Company
Product Name | Weather resistance casement open round top grill design tempered frosted glass arched aluminum swing window for new home |
Keywords | Grill design window |
Window Type | Arch top aluminum swing window/ casement window |
Profile | 1.4 mm, 1.6 mm, 2.0 mm thickness aluminum profile |
Glass | Double frosted glass (5G+9A+5G) or (5G+12A+5G) Clear glass or frosted glass |
Hardware | Germany brand handles and multi point lock system |
Surface treatment | Powder coated finished |
Colors | White, gray, black and wood grain color (other colors can be customized) |
Application | New home. apartment, villa |
Feature | Weather resistance, sound-proof |
Delivery Time | 25-35 Days after paying deposit |
Q1: How can I get the quote?
A: Please kindly send your order plan, such as size list, design picture or simple drawings, and aluminum color, then you could receive the recommendation correspondingly and quote shortly.
Q2: How are the windows package to protect the glass?
A: All of our products are packed by following steps:
Step 1. The surface of the profile all covered with protective tapes bubble film.
Step 2. Fix windows and doors in the wooden crate.
With pull of our protection, the goods can arrived in safe and sound.
Q3: What shipping method will adopt?
A: We ship out the door by sea, to the port closest to you. Or using your own agent is acceptable.
Q4: What's the production time?
A: We will start to make the production after we get deposit. Normally, it needs around 30 to 35 days for producing.
Q5. Could I know the Order Process?
Q2: How are the windows package to protect the glass?
A: All of our products are packed by following steps:
Step 1. The surface of the profile all covered with protective tapes bubble film.
Step 2. Fix windows and doors in the wooden crate.
With pull of our protection, the goods can arrived in safe and sound.
Q3: What shipping method will adopt?
A: We ship out the door by sea, to the port closest to you. Or using your own agent is acceptable.
Q4: What's the production time?
A: We will start to make the production after we get deposit. Normally, it needs around 30 to 35 days for producing.
Q5. Could I know the Order Process?
A: Provide us size & drawing → Quotation → Price confirmation Shop drawing confirmation →
Manufacture → quality control Goods inspection Goods shipment
Manufacture → quality control Goods inspection Goods shipment
>> Back to Home <<