96 core adss fiber optic cable double jacket HDPE 500 SPAN manufacturer price
Negotiable
Min.Order:1
8core ADSS 100 span adss fiber optic cable 1km price with factory adss cable price 200km in stock
factory price adss cable 12 core adss single jacket span 200
adss 24 core fiber optic cable single jacket HDPE 100 span factory price and fast delivery
Adss 24 core fiber optic cable span 200M -1000M adss manufacturer in China
High quality outdoor Fiber Optical cable 192 Core Single Mode ADSS Fiber Optic Cable
Cable Performance Parameter | |||
Span meter | 200 | 300 | 400 |
Related Strength Tension(RTS) | 17.5 kn | 20.6 kn | 28 kn |
Max Allowable Tension(MAT) | 6.9 kn | 8.2 kn | 11.5 kn |
Allowable Crush Resistance | Long Term: 1100 n/100mm | Long Term: 1100 n/100mm | Long Term: 1100 n/100mm |
Short Term: 2200 n/100mm | Short Term: 2200 n/100mm | Short Term: 2200 n/100mm | |
Minimum Bending Radius | Operating: 220 mm | Operating: 220 mm | Operating: 220 mm |
Installlation: 360 mm | Installlation: 360 mm | Installlation: 360 mm | |
Temperature Range | Operating: -40 /+70℃ | Operating: -40 /+70℃ | Operating: -40 / +70℃ |
Installlation: -15 / +60℃ | Installlation: -15 / +60℃ | Installlation: -15 / +60℃ | |
Out Sheath Material | Electrical Resistance AT (Borealis material 6081) Sheath | ||
Note | ice accretion 5MM,weed speed:30M/S |
MORE PRODUCT
G652D Outdoor Types ADSS Fiber Optic Cable 1KM price G652D Outdoor Types ADSS Fiber Optic Cable 1KM price G652D Out
1.Are you the real manufacturer?
Us. We are the real manufacturer with 15 year’s history.
2.What’s the MOQ?
Us. The MOQ of Fiber Optic cable is 1km.
3.What’s delivery time?
Us. The general delivery time is 5-7 days after order confirmed. It depends on the order quantity.
4.How to Store the Optical Fiber Cable Properly?
Us. Store the drum indoor before using, the drum should place sideways not on the end.
5. Can you supply customized products and logo?
Yes. We supply OEM service. You can send us your drawing.
6.What’s your payment terms?
Us. We accept T/T,L/C,Western Union,D/P etc. 30% in advance and 70% before shipment.