New model prefabricated house professional manufacture steel structure
Negotiable
Min.Order:1
New model prefabricated house professional manufacture steel structure
♣ Professional non-destructive testing, fully equipped.
♣ Full set of manufacturing process plan to delivery on time.
♣ Well-experienced engineer team and production team for steel structure fabrication.
♣ Professional surface treatment: hot-dip galvanizing, sandblasting, paint spraying, powder coating, plating.
♣ Owing plasma cutting, high-power laser cutting and water jet cutting. available to provide multiple cutting service.
Steel structure products
Main Steel | |
Steel Beam Column | Q235B,Q345B |
Secondary Steel | |
Tie Bar | Q235B |
Purlin | C and Z purlin |
Bracing | Q235B |
Accessories | |
Surface | Painted or Hot Dip Galvanized |
Door | Rolling Up Door or Sliding Door |
Window | PVC or Aluminum Alloy |
Roof and Wall Panels |
Corrugated Steel Sheet, EPS Sandwich Panel, Rock Wool Sandwich Panel, PU Sandwich Panel |
Others | |
Service | Design, Fabrication and Installation |
We can offer quotations according to customers’ drawings and requirements,free design drawings and detailed installation drawings. |
|
Design software: Auto CAD,PKPM,MTS,3D3S, TArch, Tekla Structures(X steel)V12.0, etc. |
|
Packing |
main steel frame with 40 OT roof and panel load in 40 HQ Or According To Customer Requirement |
Images
Professional service we can provide:
♦ Steel frame structure
♦ Steel frame – support structure
♦ Steel framework – concrete shell structures
♦ Steel Framework –concrete wall structure
♦ Steel truss framework –support structure
♦ Steel truss framework –concrete structure of the cylinder
♦ Tube-in-tube structure
♦ The support structure of giant framework.
Shipping
Steel Structure fixed packing, loading, transportation, unloading the matters needing attention:
(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.
(5) The member to the construction site, timely organization of unloading, stacking area.
(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.
Application
FAQ
Q1. What is your payment terms?
L/C, D/A, D/P, T/T, Western Union and MoneyGram.
Q2. Once the received products found not comply with the products the contract demands, what will you do?
Once the received products found not comply with the products the contract lists, when receiving the pictures and the official documents and data from your side, if it is proved not comply, we will compensate the loss at first time.
Q3.Can I visit your company and factory?
100% sure. Our company and warehouse locate in Tianjin, where we can do great marketing and exporting.
If you want to visit us, please feel free to contact us to make an appointment.
Q4. What can you do for us?
We always shorten delivery time for our buyers.
We always packed steel products well.
We always fix steel product in container well to make it safe arrive at destination port.
We always provide best and professional forward service and after sales service.
Please feel free to contact! Looking forward to be at your service!