factory low price low carbon spiral welded round steel pipe
Negotiable
Min.Order:1
Spiral bridge water filter pipe/water well bridge slot screen
EN10296 SSAW HSAW DSAW Steel Pipe, S355 Spiral Steel Pipe API 5L psl1 x42 x50 x60 x70
Wholesaler large quantity 304 welded thin wall stainless steel pipe from china
Alloy Seamless Steel Pipe / Aisi 4130 Alloy Steel / Seamless Steel Tube
ST52-3 Hollow bar and seamless steel tube with thick wall factory supplier
High temperature superheater 12Cr1Mov 38 x 5.5mm seamless steel tube price
Spiral pipe, also known as spiral steel pipe or spiral welded pipe, is the low carbon structural steel or low alloy structural steel belt according to a certain Angle of the spiral line (called forming Angle) rolled into tube billet, and then welded together tube seam made
BRAND NAME: | Tianjin Emerson Steel |
GRADE: |
Q235A,Q235B,Q345,L245,L290,X42,X52,X60,X70,X80,0Cr13,1Cr17,00Cr19Ni11,1Cr18Ni9, 0Cr18Ni11Nb |
LENGTH: | 5-12m |
THICKNESS: | 3-80mm |
TYPE: | Round section |
TECHNICAL: | Hot rolled |
SURFACE: | can make black paints and galvanized |
PLACE OF ORIGIN: | Tianjin |
CERTIFICATION: | API CE ISO |
PAYMENT: | T/T L/C |
PACKING: |
In Bundles Standard export packing As per customer's request |
ADVANTAGE: |
1.Reasonble price with excellent quality 2.Abundance stock and prompt delivery 3.Rich supply and export experience sincere service |
MOQ: | 1TON |
Tianjin Emerson Commercial and Trade Co.,Ltd has large stocks for the carbon steel and low alloy steel plates and sheets, especially have the thick plate and heavy plates on stock, also can provide the special material and large size steel plates, boiler and pressure vessel steel plate, marine steel plate, hot rolled steel plate for new production.
Tianjin Emerson Commercial and Trade Co.,Ltd can provide good service for customer,good quality products, fast delivery, and after-sale service.
1.How long can make delivery? | |||||||
For stock products, will make shipments in 5- 7 days after receiving deposit or receiving L/C; for products need new production for common materials, usually make shipments in 15-20 days; for products need new production for special and rare materials, usually need 30-40 days to make shipment. | |||||||
2. Once the received products found not comply with the products the contract demands, what will you do? | |||||||
Once the received products found not comply with the products the contract lists, when receiving the pictures and the official documents and data from your side, if it is proved not comply, we will compensate the loss at first time. | |||||||
3. If any sizes are available? | |||||||
Yes, we can customize the special size for you. |