5MM*1250*4000MM a36 a38 low carbon construction coil steel sheet plate with delivery time 1 day
Negotiable
Min.Order:1
Stock immediate delivery 10MM*2000*6000MM hot rolled a36 ss400 sheet steel plate
different types of ms plate grades mild steel plate astm a37 a36 size 10mm thick mild sheet
carbon steel st37 plate 6mm 10mm thickness hardened steel plate price per kg
astm a283 gr.c carbon steel plate 19mm thick steel plate standard thickness
Thick-walled hollow round steel pipe DN400 thick-walled SCH160 seamless steel pipe
Tolerance | Standard tolerance |
Standard | GB,AISI,ASTM,JIS,DIN,API |
Technical | Hot rolled |
Surface | Coated |
Application | Used for bridge and construction riveting, bolted and welded structure, as well as general purpose structural steel quality of carbon steel, steel plate and bar steel. |
Place of origin | Tianjin,China |
Certification | API,CE,ISO,SGS |
Payment | T/T , L/C , Western Union |
Packing | 1.In bundles 2.Standard export packing 3.According to customer's requirements. |
Delivery detail | Normally 1 working days after get deposits or according to quantity |
Advantage | 1. Reasonable price with excellent quality 2. Abundant stock and prompt delivery 3. Rich supply and export experience, sincere service |
MOQ | 1 piece |
1. Steel coils picture for details:
2.Shipment and packing:
3. Our factory:
4.Our certificate:
5.Related production:
(1)Cold rolled steel coils cut to plate
Thickness: 0.5mm-3.0mm width: 800mm/1250mm
(2)Galvanized steel plate
Galvanized steel coils cut to plate
Thickness: 0.1mm-2.5mm width: 600mm/800mm/1250mm
(3) Al-zinc coils and plate
(4)Seamless steel pipe, seamless steel tube, seamless pipe, Hollow bar sizes: outer diameter: 8mm-800mm, wall thickness: 1mm-80mm
(5) Round bar
Material: S235JR, 1045, 1018, 1518, 1020, 41040, 4340, 8620 and other materials
Diameters: 3mm- 800mm
(6)steel profile
angle bar; channel bar; h beam; rectangular tubes
6.steel plate cutting and processing:
1. How long can make delivery?
For stock products, will make shipments in 5- 7 days after receiving deposit or receiving L/C; for products need new production for common materials, usually make shipments in 15-20 days; for products need new production for special and rare materials, usually need 30-40 days to make shipment.
2. Will the Test Certificate be certified to EN10204 3.1?
For the new production products no need furthur cutting or processing, will provide the Original Mill Test Certificate certified to EN10204 3.1; for the stock products and the products need cutting or furthur processing, will issue Certificate of Quality on our Company, It will show the original mill name and the original datas.
3. Once the received products found not comply with the products the contract demands, what will you do?
Once the received products found not comply with the products the contract lists, when receiving the pictures and the official documents and data from your side, if it is proved not comply, we will compensate the loss at first time.
Low alloy hot rolled s235jr en 10025 s335j2 n steel plate