In stock s355 hot rolled 12mm thick steel plate
Negotiable
Min.Order:1
Details
Material : | S275J2, S275J0, S275JR, S355J0, S355JR, S355J2, S355J2 Hot rolled steel sheet and plate |
Thickness: | 1.2mm-25mm |
Width: | 1000mm-2500mm |
Length: | 1000mm-15000mm |
Heat treatment: |
normalized or tempered |
1.Special size
|
We will customize the special size for you. |
2.The fastest delivery time
|
The delivery date of the spot goods is 2-3days |
3.The best quality |
Actual MILL TEST CERTIFICATE |
4.Credible |
We promise to give you the best price and best quality. |
5.The best service |
We promise to reply to you within 12 hours
|
1.20 feet container contains dimension:Width under 2300mm, length under 6000mm
2.40 feet container contains dimension:Width under 2300mm, length under 12000mm
3.By bulk vessel:Freight charge is low by bulk cargo, and large heavy sizes can not be loaded into containers can shipping by bulk cargo
Tianjin Emerson Commercial and Trade Co.,Ltd mainly provides steel plate, steel sheet, steel pipe,seamless steel pipe and tube, round bars and steel section, and doing steel products processing service: steel plate and sheet processing service. The processing works concludes cutting the larger plate into the small sizes customer demand, cut by drawing, cut to special sizes, weld the cut parts by drawing, also make galvanizing processing or surface painting on the final processed parts; steel pipe hollow bar cutting and lathe processing to make the outer diameter and wall thickness to meet customers requirement, also make heat treatment for hollow bars and pipes. Tianjin Emerson Commercial and Trade Co.,Ltd has large stocks for the carbon steel and low alloy steel plates and sheets, especially have the thick plate and heavy plates on stock, also can provide the special material and large size steel plates, boiler and pressure vessel steel plate, marine steel plate, hot rolled steel plate for new production.
1.How long can make delivery?
For stock products, will make shipments in 5- 7 days after receiving deposit or receiving L/C; for products need new production for common materials, usually make shipments in 15-20 days; for products need new production for special and rare materials, usually need 30-40 days to make shipment.
2. Will the Test Certificate be certified to EN10204 3.1?
For the new production products no need furthur cutting or processing, will provide the Original Mill Test Certificate certified to EN10204 3.1; for the stock products and the products need cutting or furthur processing, will issue Certificate of Quality on our Company, It will show the original mill name and the original datas.
3. Once the received products found not comply with the products the contract demands, what will you do?
Once the received products found not comply with the products the contract lists, when receiving the pictures and the official documents and data from your side, if it is proved not comply, we will compensate the loss at first time.