Seamless Seel Carbon Pipe for Industrial High Quality Low Price
Negotiable
Min.Order:1
Product Name | Seamless Seel Carbon Pipe for Industrial High Quality Low Price |
Standard | ASTM A106 ,ASTM A53 ,API5L B ,ASTM A179, ASTM A210 ,ANSI B36.10, GB 5310,GB6479, GB9948, GB/T17396GB 3087, GB/T 8162 ,GB/T8163 |
Outer Diameter | 12mm-800mm |
Wall Thickness | 1mm-75mm |
Length | 6m,12m or as per customer's requirements |
Packing | In bundles tied with steel stripes |
Payment Term | T/T, L/C at sight |
Delivery Time | 10-30 days after get the deposit |
Delivery condition | Beveled or Plain end with varnish/2PP/2PE/3PE/3PP anticorrosive coatingas per clients confirmation; With or without protecting caps as percustomer's requirements; with FBE internal coating for water steel pipes. |
Material | A53(A,B), A106(A,B), Q345, 16Mn, 10#, 20#, 45#, S235JR, S355JR; ASTMA252 Gr.2,Gr.3; ST37,ST42,ST52;Gr.B,X42,X46,X52,X56,X60,X65,X70, etc |
Usage | for petroleum/ natural gas pipeline, for conveying water,drainage,coal gas, mineral slurry and other low middle pressure liquids. Also for chemical industry, building structure,heat supply and pile driving projects. |
Export to | Canada, USA, Argentina,Peru, Chile, Colombia, Brazil, Venezuela,Malaysia, Singapore, the Czech Republic, Australia, Myanmar, Kenya, South Africa, Spain, Italy, France, England, the Netherlands,Belgium, etc |
Certificates | API 5L; ISO9001:2000, MTC |
Seamless Seel Carbon Pipe for Industrial High Quality Low Price
Packing Details: Export standard package, or as customers request.
The inner size of container is below:
20ft GP: 5.8m(length) x 2.13m(width) x 2.18m(high)
40ft GP: 11.8m(length) x 2.13m(width) x 2.18m(high)
40ft HG: 11.8m(length) x 2.13m(width) x 2.72m(high)
Delivery Details : 7-15 days, or according to the order quantity or upon negotiation.
Seamless Seel Carbon Pipe for Industrial High Quality Low Price
These are the workshops of our cooperative facotries. They have very strong productivity.
And the test machine and responsible staff ensures the quality products.
Tianjin Yichengtong Steel Trade Co., Ltd is a comprehensive company, who is founded in 2008. Specialized in stainless steel products, seamless steel pipe, welded steel pipe, steel coil and plates. It is located in Tianjin, the Steel base of China, which is known all over the world. It is very close to Xingang Seaport, where is much convenient in land carriage, carriage by sea and carriage by air.
Modern large-scale outdoor storage and indoor storage have been set up in our company, and 20,000 tons of available goods have been prepared." Providing Quality Products, Excellent Service, Competitive Prices and Prompt Delivery" we are looking forward to even greater cooperation with overseas customers based on mutual benefits.
1. Can you provide free samples?
A: Yes, we can provide you the Small samples in store for free, but the freight shall be borne by your side.
2. How do you control quality ?
A: Mill Test Certification is supplied with shipment, Third Party Inspection is available.
3. What are the advantages of your company ?
A: We have many professionals, technical personnel, more competitive prices and best after-dales service than other stainless steel companies.
4. Can I request to change the form of packaging and transportation?
A: Yes, We can change the form of the packaging and transportation according to your request, but you have to bear their own costs incurred during this period and the spreads.
5.Can I have my own Logo on the product?
A: Yes, you can send us your drawing and we can make your logo, but you have to bear their own the cost.
6. Can you produce the products according to my own drawings?
A: Yes, we can produce the products according to your drawings that will be most satisfy you.
7.Which price terms could accepted?
A: FOB,CRF,CIF,EXW all acceptable.
8.What is your terms of payment ?
A: Usually 30% deposit by TT in advance and balance against copy of BL or L/C at sight.
9. How long is your delivery time?
A: For Stocks, we can send the goods to loading port within 7 days after receiving the deposit;
For production period, it usually needs about 15 days~30 days after receiving the deposit.