Iron black carbon steel seamless pipe ST52 ST37 oil and gas steel pipes tube
Negotiable
Min.Order:1
Commodity | carbon steel seamless pipe ST52 ST37 oil and gas steel pipes tube |
Grade | Structural pipe -- 20# 35# 45# Q345B, 16Mn, Q345B-E, SAE1018, SAE1020, SAE1518, SAE1045 Liquid pipe -- 20# q295b-e, q345b-e High pressure boiler tube -- 20G 15MnG 20MnG 15CrMoG, 12Cr1MoVG, St35.8, sa106b, sa106c, sa210a, sa210c, A333P2, A333P11, A33P12, A333P22, A33P36, A333P91, A333P92, A335T2, A335T11, A335T12, A335T22, A335T91, A335T23, A335T9 Pipeline -- API SPEC 5L, X42, X52, X60, X65,X70,X80, ASTMA53, ASTM A106, ASTM A333, BS301, BS3602, BS3603, BS3604, PSL1, PSL2, DNV-OS-F101, CSA-Z245 Alloy pipe -- 4140, 42CrMo, 32CrMo, 15CrMo |
Standard | ASTM / AISI / JIS / EN / DIN / GB |
Technique | Hot Rolled, Cold Drawn |
Type | Seamless pipe |
OD | 3.0mm - 2500mm (1/8" - 100") |
Thickness | 1.0-150mm (SCH10S-XXS) |
Length | 5.8m,6m,11.8m,12m, 4-12m or as required |
Packing | In bundles, Nylon bags, wooden cases or as required |
Delivery Time | Ready stocks 3-7 days, customized 7-10 days for customized size |
MOQ | 1 Ton |
Export To | Singapore, Canada, Indonesia, Korea, USA, UK, Thailand,Saudi Arabia, Vietnam,India, Peru, Ukraine ,Brazil,South Africa, etc. |
Payment Terms | T/T, L/C, Western Union, Trade Assurance, Cash or as required |
Price Terms | FOB, CRF, CIF, EXW |
Delivery Time | Generally it is 5-10 days if the goods are in stock. or it is 30 days if the goods are not in stock, it is according to quantity. |
Packing | 1.Nylon bags 2. Wooden pallets 3. Wooden cases 4. As per customer required |
Shipping Method | LCL, FCL, Express, Air-transfer, by air, by sea, by land |
20ft GP: L5.8m * W2.13m * H2.18m , about 27 CBM, Loading Max.26 Tons 40ft GP: L11.8m * W2.13m * H2.18m, about 54 CBM, Loading Max.26 Tons 40ft HG: L11.8m * W2.13m * H2.72m, about 68 CBM, Loading Max.26 Tons |