AC4010-04 Particle Removal Compressed Air Filter Regulator And Lubricator
Negotiable
Min.Order:1
New Style Air Line Compressor Filter Regulator Air Source Treatment Units
Professional Pneumatic FRL Supplier AR Series Treatment Pneumatic Press Regulator With Press Gauge
AR Series 1/4 Inch Grey Color Pressure Gauge Pneumatic Regulator With Press Gauge
Best Quality AF Series AF2000 AF3000 AF4000 1/2 Inch G1/4 FRL Unit Pneumatic Air Filter
Pneumatic FRL Auto Drain Automatic Units AC5010-10D G1 Air Source Treatment Air Filter Regulator And Lubricator
Specification:
Body Material:Aluminum
Model:AC5010-10D
Motion pattern:Double Action
Application:Pneumatic
Working Pressure:Y50-02
Material:Aluminium Alloy
Made of high-quality materials, resistant to rust and corrosion, and durable.
Easy to install and remove, easy to operate, no additional tools or accessories required.
Fittration:25μm
Model |
AC2010-01D | AC2010-02D | AC3010-02D | AC3010-03D | AC4010-04D | AC4010-06D | AC5010-06D | AC5010-10D | |
Thread size | G1/8 | G1/4 | G1/4 | G3/8 | G1/2 | G3/4 | G3/4 | G1 | |
MAX rated flow | 500L/min | 500L/min | 1700L/min | 1700L/min | 3000L/min | 3000L/min | 5000L/min | 5000L/min | |
Pressure adjustable range | 0.15-0.85MPa | ||||||||
Fittration | 25μm | ||||||||
Max.operating pressure | Y40-01 | Y40-01 | Y40-01 | Y40-01 | Y50-02 | Y50-02 | Y50-02 | Y50-02 | |
Note | Auto drain | ||||||||
Package | Carton | ||||||||
Delivery time | 5-15 days |
What model would you like? Click here to send us an enquiry,we will reply you ASAP.
Q1. What is your terms of packing? Air Source Treatment
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 3 to 10 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
If you have any other questions, please send us an enquiry,we will reply you ASAP.