510mm diameter displacement auger*3000mm used fdp full displacement pile

510mm diameter displacement auger*3000mm used fdp full displacement pile

USD $1000 - $3000 /Piece

Min.Order:1 Piece

Supply Ability:
1000 Piece / Pieces per Month
Port:
tianjin
Payment Terms:
T/T

Quick Details View All >

Brand Name:
huachang xingye
Place of Origin:
China
Model Number:
hc2021060709022

tianjin huachang xingye technology co.,ltd

Business license
Business Type: Manufacturer
Main Products: core barrel ,drilling bucket ,double wall casing ,casing osccilator ,hydraulic casing clamp ,double wall casing extractor ,beco thread drill pipe fpr dth atlas cop ,large diameter drill pipe for dth hammer ,triple axis flight auger ,cfa for dth hammer ,continous flight auger ,drilling auger

Product Details

510mm diameter displacement auger*3000mm used fdp full displacement pile

With 209mm hexagon coupling joint, with 254mm coupling bauer type

Weight 2000kgs

Tianjin huachang xingye technology co ltd whatsapp 008618902059907 email info@tjdrilling.com




FDP auger 510mm with 254mm coupling for full displacement pile match bauer soilmec drill rig

FDP auger 360mm with 254mm coupling for full displacement pile match bauer soilmec drill rig

FDP auger 400mm with 254mm coupling for full displacement pile match bauer soilmec drill rig

FDP auger 410mm with 254mm coupling for full displacement pile match bauer soilmec drill rig

FDP auger 600mm with 254mm coupling for full displacement pile match bauer soilmec drill rig

FDP auger 620mm with 254mm coupling for full displacement pile match bauer soilmec drill rig

FDP full displacement pile extension pipe 510mm used for pile foundation

FDP casing joint 510mm used for full displacement pile

Tianjin huachang xingye techmology co ltd produce fdp auger 510mm for full displacement pile

advantage of full displacement pile is the relatively simple technology, where no temporary casings are used,While the full displacement auger is screwed into the ground, with the lower opening plugged by a bottom plate, the soil gets

completely displaced and thus compacted.

The borehole stays dry without any excavation is taking place. This silent and vibration-free drilling method is highly suitable

for jobs, where the existing ground water table cannot be disturbed, or if the soil is contaminated and an exchange of the

contaminated soil is excluded, as well as on jobs, where adjacent buildings need to be protected.

The borehole-wall is supported at all times and the risk of collapsing does not exist. During the concreting process the full

displacement auger continues to turn clockwise while being extracted, so that the tangential reamers creating spiral-like grooves

in the borehole wall. These grooves are filled by the static pressurized concrete and thus the load-carrying capacity of the pile

increases considerably.

 tianjin huachang xingye technology co ltd whatsapp 008618902059907 email info@tjdrilling.com


Contact Supplier

Mr. andy dai manager Chat Now
Mobile
86-15222875497

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Construction & Real Estate > Earthwork Products > Other Earthwork Products
Categories
Hi~