510mm diameter displacement auger*3000mm used fdp full displacement pile
USD $1000 - $3000 /Piece
Min.Order:1 Piece
tianjin huachang xingye technology co.,ltd
Double wall casing ID540*620MM USED FOR PILE FOUNDATION WORK
Flat teeth FZ72 and flat teeth holder FZH72 bauer type for soil drilling bucket
Flat teeth FZ162 and flat teeth holder FZH72 bauer type for soil drilling bucket
Flat teeth FZ100 and flat teeth holder FZH72 bauer type for soil drilling bucket
Flat teeth FZ69 and flat teeth holder FZH72 bauer type for soil drilling bucket
casing joints male part and female part 1200mm used for double wall casing
510mm diameter displacement auger*3000mm used fdp full displacement pile
With 209mm hexagon coupling joint, with 254mm coupling bauer type
Weight 2000kgs
Tianjin huachang xingye technology co ltd whatsapp 008618902059907 email info@tjdrilling.com
FDP auger 510mm with 254mm coupling for full displacement pile match bauer soilmec drill rig
FDP auger 360mm with 254mm coupling for full displacement pile match bauer soilmec drill rig
FDP auger 400mm with 254mm coupling for full displacement pile match bauer soilmec drill rig
FDP auger 410mm with 254mm coupling for full displacement pile match bauer soilmec drill rig
FDP auger 600mm with 254mm coupling for full displacement pile match bauer soilmec drill rig
FDP auger 620mm with 254mm coupling for full displacement pile match bauer soilmec drill rig
FDP full displacement pile extension pipe 510mm used for pile foundation
FDP casing joint 510mm used for full displacement pile
Tianjin huachang xingye techmology co ltd produce fdp auger 510mm for full displacement pile
advantage of full displacement pile is the relatively simple technology, where no temporary casings are used,While the full displacement auger is screwed into the ground, with the lower opening plugged by a bottom plate, the soil gets
completely displaced and thus compacted.
The borehole stays dry without any excavation is taking place. This silent and vibration-free drilling method is highly suitable
for jobs, where the existing ground water table cannot be disturbed, or if the soil is contaminated and an exchange of the
contaminated soil is excluded, as well as on jobs, where adjacent buildings need to be protected.
The borehole-wall is supported at all times and the risk of collapsing does not exist. During the concreting process the full
displacement auger continues to turn clockwise while being extracted, so that the tangential reamers creating spiral-like grooves
in the borehole wall. These grooves are filled by the static pressurized concrete and thus the load-carrying capacity of the pile
increases considerably.
tianjin huachang xingye technology co ltd whatsapp 008618902059907 email info@tjdrilling.com