XINRONG 16~630mm pvc pipe making machine price/pvc pipe extrusion machine
XINRONG 16~630mm pvc pipe making machine price/pvc pipe extrusion machine
XINRONG 16~630mm pvc pipe making machine price/pvc pipe extrusion machine
XINRONG 16~630mm pvc pipe making machine price/pvc pipe extrusion machine
XINRONG 16~630mm pvc pipe making machine price/pvc pipe extrusion machine

XINRONG 16~630mm pvc pipe making machine price/pvc pipe extrusion machine

Negotiable

Min.Order:1

Supply Ability:
1000 per Month
Payment Terms:
T/T Credit Card

Jiangsu Xinrong Science & Technology Development Co., Ltd.

Business Type: Agent
Main Products: , , ,

Product Details

Product Description

PVC PIPE PRODUCTION LINE

Main Technical Features

1 It is maily used to produce all kinds of UPVC pipes for agricultural water supply and drainage, building water supply and drainage and cable laying.etc.

2. Saw cutter and planetary cutter for choice.

3. Changing some parts can also produce M-PVC pipe, C-pvc Pipe, inner spiral wall pipe, inner hollow wall pipe, formed core pipe.

4. Conical twin screw extruder and parallel twin screw extruder for choice.

5. Double-strand and four -strand for choice for small pipe.


Model
Pipe range(mm)
Haul-off speed(m/min)
Total Length(m)
0utput capacity(kg/h)
total power(kw)
UPVC63
16-63
1.5-15
32
100-150
65
UPVC160
50-160
0.8-8.0
32
180-250
94
UPVC250
90-250
0.35-3.5
38
300-450
170
UPVC315
110-315
0.3-3.0
34
300-450
198
UPVC450
125-450
 0.3-3.0
42
650-750
258
UPVC630
355-630
 0.2-2.0
48
650-750
399
UPVC32SS
4x(16-32)
4x(1.0-10)
24
180-250
85
UPVC63S
2x(16-63)
2X(1.5-15)
24
180-250
96
Detailed Images
Conical twin screw extruder
Advanced overall design of direct combination. Efficient screw and spiral water cooling sleeve in barrel, can realize extruding material in low melt temperature in high speed.
Relation between capacity and screw rotation speed is nearly linear, stable extrusion, high reliability, easy for operation.
Extrusion Die head 

Vacumm Tank
Vacuum tank is used to shape and cool pipes, so as to reach standard pipe size. Its shape is advanced foreign multilateral anti-deformation structure. The cover is made of high quality casting aluminum alloy. The pipeline adopts the design of double loop pipeline, realizing non-stop pipeline clean and function of temperature control.
Caterpillar Haul-off Machine 
Its structure with sliding tempering glass door is beautiful and practical. Traction device with V type rubber block caterpillar and controlled by imported inverter can steadily haul pipes. It also features compact structure and free maintenance.

Adopt special automobile drive shaft to transmit power, stable and reliable. Length measuring device equipped with a rotary encoder, can ensure precise cutting, customer can set the cutting length.
Planetary Saw Cutter
Its structure is beautiful and practical. Cutting process is controlled by imported PLC programmable controller, realizing precise cutting.
Its biggest character: the revolution speed of cutting device is adjustable to meet the need of cutting different specification of pipes.
Company
Why choose us?

1. Quality

We have more than 23 years manufacturing experience with more than 800 sets machine lines sold to worldwide. We have our own CNC
center to produce machine parts. And control the machine quality from the order confirm to engineers discuss & design, machine
processing, testing and delivery. We are one of the Top10 manufacturers for this business in China.

2. Price

Machine price determines your end product cost. Our machine price can make you earn back equipment investment in 2-3 months. We do
not sell the cheapest machine, just good quality at good price.

3. Service

We provide turnkey project and completely pre-sales and after-sales service, including project feasibility analysis, installation,
commissioning and training.
Certifications
Installation Instructions
Arrangement for inspection, installation and testing work
1. After all machines are delivered to customer’s factory; Buyer is responsible for all preparation work, e.g. electricity supply,water supply, raw material,labors and cranes, etc.
2.We will prepare the visa for our engineers, who are responsible for guiding of machine installation and testing at the factory.
3.The buyer should bear the round-trip air ticket for engineer if visa application is approved. The buyer is also responsible tobear expenses generated according to local conditions, e.g. visa formalities, meals, accommodation and allowance of USD100 per day for each engineer.
4.Engineer will give free training lessons to labors in buyer’s factory.
Packing & Delivery
Trade terms
1.Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable
2.Delivery Time: 40 days after receipt of prepayment.
3.Packing Method: Packing film or wooden case
4.Guaranteed Time: 12 months

MACHINERUNNING TEST AND AFTER SERVICE
1.When machine finished, we will invited client come to our factory to check the machine and do the machine test. If machine isok, then client pay for the balance. And inspect machine load the container.
2.When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine
installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.
3.If have any question or problem on machine operation or maintain, welcome to contact to us by email or calling. We stand by 24hours.

Contact Supplier

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Plastic & Rubber Machinery > Plastic Product Making Machinery > Plastic Extruders
Categories
Hi~