Xinrongplas Waste Water Tube Pp Ppr Pe Pipe Extrusion Production Line Making Machine
Xinrongplas Waste Water Tube Pp Ppr Pe Pipe Extrusion Production Line Making Machine
Xinrongplas Waste Water Tube Pp Ppr Pe Pipe Extrusion Production Line Making Machine
Xinrongplas Waste Water Tube Pp Ppr Pe Pipe Extrusion Production Line Making Machine
Xinrongplas Waste Water Tube Pp Ppr Pe Pipe Extrusion Production Line Making Machine

Xinrongplas Waste Water Tube Pp Ppr Pe Pipe Extrusion Production Line Making Machine

Negotiable

Min.Order:1

Supply Ability:
1000 per Month
Payment Terms:
T/T Credit Card

Jiangsu Xinrong Science & Technology Development Co., Ltd.

Business Type: Agent
Main Products: , , ,

Product Details

Product Description

Main Technical Features

PP-R pipe extrusion line is developed by Xinrong based on European advanced technology and R&D experience of the plastic machinery for many years. Advanced design, resonable structure, high reliability, high degree automation of the complete line. 


Changing some parts of the line can also produce PP-B pipe.


Model 
Pipe Range(mm)
Haul Speed(m/min)
Total Length(m)
Output Capcaity(kg/h)
Total Power (kw)
PP-R63
16-63
2.0-20
36
70-150
103
PP-R110
20-110
1.5-15
38
140-220
186
PP-R160
50-160
0.8-8
40
180-220
192
PP-R63S
2x(16-63)
2x(1.2-12)
35
180-220
160

S Double -strand pipes 

Detailed Images

Single Screw Extruder

Advanced overall design of direct combination. Efficient screw and spiral water cooling sleeve in barrel, can realize extruding material in low melt temperature in high speed.

Relation between capacity and screw rotation speed is nearly linear, stable extrusion, high reliability, easy for operation.

Die head

Can choose single layer die head or multi-layer die head to produce pipe with single layer or multi-layer.

Vacuum Tank

Vacuum tank is used to shape and cool pipe, so as to reach standard pipe size. Its shape is advanced foreign multilateral anti-deformation structure. The cover is made of high quality casting aluminum alloy. The pipeline adopts the design of double loop pipeline, realizing non-stop pipeline clean and function of temperature control.

Haul-off Machine

Based on pipe sizes, have two, three,four, six, eight, ten, twelve or sixteen even more claws. Traction speed is designed based on extruder capacity and pipe sizes.
Customer can choose servo motor.

Dust free knife cutter

Its structure is beautiful and practical. With glass window design, cutting process is controlled by PLC, can realize accurately arbitrary length cutting.
Our Company
Why choose us?

1. Quality

We have more than 23 years manufacturing experience with more than 800 sets machine lines sold to worldwide. We have our own CNC center to produce machine parts. And control the machine quality from the order confirm to engineers discuss & design, machine processing, testing and delivery. We are one of the Top10 manufacturers for this business in China.

2. Price

Machine price determines your end product cost. Our machine price can make you earn back equipment investment in 2-3 months. We do not sell the cheapest machine, just good quality at good price.

3. Service

We provide turnkey project and completely pre-sales and after-sales service, including project feasibility analysis, installation, commissioning and training.
Certifications
Installation Instructions
Arrangement for inspection, installation and testing work
1. After all machines are delivered to customer’s factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, raw material,labors and cranes, etc.
2.We will prepare the visa for our engineers, who are responsible for guiding of machine installation and testing at the factory.

3.The buyer should bear the round-trip air ticket for engineer if visa application is approved. The buyer is also responsible to bear expenses generated according to local conditions, e.g. visa formalities, meals, accommodation and allowance of USD100 per day for each engineer.

4.Engineer will give free training lessons to labors in buyer’s factory.
Packing & Delivery
Trade terms

1.Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable.
2.Delivery Time: 40 days after receipt of prepayment.
3.Packing Method: Packing film or wooden case
4.Guaranteed Time: 12 months

MACHINERUNNING TEST AND AFTER SERVICE

1.When machine finished, we will invited client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container.

2.When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.

3.If have any question or problem on machine operation or maintain, welcome to contact to us by email or calling. We stand by 24 hours.
If you have any request for plastic crushing and washing machine, please feel free to contant with me.

Contact Supplier

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Plastic & Rubber Machinery > Plastic Product Making Machinery > Plastic Extruders
Categories
Hi~