Big size constant temperature vehicle Drive-in chamber
Negotiable
Min.Order:1
Guangdong Huanrui Test Equipment Co., Ltd.
temi880 big size assembled Freezer Environmental Temp Humidity room
Big size climatic test Laptop/desktop temperature humidity testing room
big size Power sockets/packaging/printing products temperature and Humidity testing room
Factory plastic board/Shoes/toy cars temperature constant test room price
Factory/industrial programmable test equipment walk In stability burn in room
IEC60529 Standard Temperature Humidity Chamber Walk In Test
Uses:
Walk-in constant Temperature and humidity laboratory for industry large parts, semi-finish product,finish products
temperature and humidity environment testing. Such as computer terminal, car nstant temperature
and humidity room is composed of control panel,switchboard,hydrating panel,fan, heater,humidifier,refrigerator
This equipment mainly used for create and keep temperature humidity constant space,completely automatic control
refrigeration,heating,dehumidify,humidification,supplementary humidified water,The equipment can be added (optional)
air exchange function,operator can long term work in it when exist poor volatile gas.Suitable for electrical, electronic,
instrument and other products, parts and components salt spray test chamber and material compatibility test of storage
transport using under high low temperature alternating,humid and hot environment.
Design Standard:
IEC60068-2-1.1990 testing methods for low-temperature
IEC60068-2-2.1974 testing methods for high-temperature
GJB150.
Character:
Image:
Parameter:
IEC60529 Standard Temperature Humidity Chamber Walk In Test
Model |
RHPW-4 |
RHPW-6 | RHPW-8 | RHPW-13 | RHPW-17 | RHPW-21 |
System | Balanced temperatuer & humidity control system | |||||
Testing temperature range |
R.T-65℃~+120℃ |
|||||
Humidity range |
20%-95%RH |
|||||
Temperature fluctuation |
±0.5℃ |
|||||
Humidity fluctuation |
±2.5%RH |
|||||
Temperture uniformity | ±2.0℃ | |||||
Humidity uniformity |
±5.%RH |
|||||
Temperture deviation |
±2℃ |
|||||
Humidity deviation |
±3%RH (≥75%) ±5%RH(<75%) |
|||||
Heat up time |
20℃~+80℃ within 60 minutes | |||||
Pull down time |
20℃~-55℃,-40℃,-30℃,-20℃,-10℃ within 120 or 90 or 60 minutes. | |||||
Interior volume(m3) | 9.04 | 12.9 | 16.78 | 27.09 | 35.21 | 43.34 |
Interior material | SUS#304 Stainless steel plate | |||||
Exterior material | Model steel | |||||
Insulation material | Rigid polyerethane foam +glass fibre | |||||
Floor bearing load | 500Kg/m3 | |||||
Refrigeration system | Air cooled (Water cooled type is option) | |||||
Cascade type, hermetic/semitight compressor,CFC free refrigerant | ||||||
Controller | Color LCD screen in English/Chinese, programing,communicating function | |||||
Safety devices | No welding wire switch,compressor overheating and over current protection,over temperature protection, blower overload protection,dry heating machine protector,low water protection,fault warning system. | |||||
Power | AC380±10% 50HZ 3 phase 4 ires+ground wires |
Optional accessories: