Programmable 100L Industrial Touch Screen Hot and Cold Environmental Test Chamber Climate Test Chamber
Negotiable
Min.Order:1
Guangdong Huanrui Test Equipment Co., Ltd.
Industry/lab product Water resistance Waterproof Raining Test cabinet
Environmental Salin Fog Mist Climatic Cyclic Corrosion Used Salt S/salt Mist Resistance Testing
UV accelerated weathering test chamber/uv ageing testing price
laboratory digital Touch Screen Rubber and Plastic UV Weathering Aging Test Chamber
Programmable 100L Industrial Touch Screen Hot and Cold Environmental Test Chamber Climate Test Chamber
Uses:
Hot and Cold Temperature Impact Tester Thermal Shock Test Chamber used to test the material structure or composite material in an instant by the extremely high temperatures and very low temperature continuous environment which can endure the degree of order in the shortest possible time to test its thermal expansion and contraction caused by chemical changes physical harm.
The applicable the object material, including metals, plastics, rubber, electronic, ..., etc., can be used as the basis of its product improvement or reference.
Design Standard:
GB11158
GB10589-89
GB10592-89
GB/T10586-89
GB/T2423.22-2001
GB/T2423.1-2001
GB/T2423.2-2001
GB/T2423.3-93
GB/T2423.4-93
ASTM D1735
EIA - 364-59
IEC60068-2-1.1990
IEC60068-2-2.1974
IEC 68-2-30
IEC68-2-03
EIA - 364-31C
Character:
Automatically setting of pro-cooled and pre-heated air.
Testing samples don't move, cable port is available for power on testing.
Powerful interactive touch screen controller, easy operation and setting
High accurate temperature recovery with PID auto tuning, High formula memory capacity can store 120 patterns, 9999 cycles, setting time for each pattern is 9999 Hrs 59 Mins
Auto defrost function
Three sections: High temperature zone, low temperature zone, testing zone.
Image:
Parameter
Model |
RTS-50 | RTS-80 | RTS-100 | RTS-150 | RTS-200 | RTS-300 | RTS-480 |
System | (BTC) Balanced temperature control system | ||||||
High temperature chamber |
+60℃~200℃ | ||||||
Preheating time |
+60℃~200℃ About 20 minutes | ||||||
Low temperature chamber |
-55℃~10℃, -70℃~10℃, -80℃~10℃ |
||||||
Precooling time |
+20℃~-55℃ 60 minutes, +20℃~-75℃ 75 minutes, +20℃~-80℃ 90 minutes, |
||||||
Test chamber | -40℃~150℃, -55℃~150℃, -65℃~150℃ | ||||||
Recovery time | Within 5 minutes, heat exposure 30 minutes, low exposure 30 minutes, | ||||||
Transfer time |
Within 10 seconds | ||||||
Temperature flucturation |
±1.0℃ |
||||||
Temperature deviation | ≤±2.0℃ | ||||||
Test weight (KG) | 3.5 | 5 | 5 | 5 | 10 | 12 | 15 |
Interior material | SUS#304 Stainless steel plate | ||||||
Exterior material | Backed paiting steel or stainless steel(SUS304) | ||||||
Insulation material | Rigid polyruethane foam +glass fibre | ||||||
Floor bearing load | 500Kg/m3 | ||||||
Refrigeration system | Air cooled (Water cooled type is option) | ||||||
Cascade type, hermetic/semitight compressor,CFC free refrigerant | |||||||
Controller | Color LCD screen in English/Chinese, programing,communicating function | ||||||
Safety devices | No welding wire switch,compressor overheating and over current protection,over temperature protection, blower overload protection,dry heating machine protector,low water protection,fault warning system. | ||||||
Power | AC380±10% 50HZ 3 phase 4 wires+ground wires |
Q: Are your company a trading one or a factory?
A: We are a factory over18-year experience.
Q: After an order is placed, when to deliver?
A: Generally about 25days. If we have inventory, we can arrange to ship within 3-5 days. Please be aware that our production lead times depend on specific items and item quantities.
Q: What about the product' services and quality?
A: We have Pre-service, middle-service and after-sale service. Can provide video training to show you how to install & operate. We can also arrange engineer to train the operation of equipment to customer's company when you need. Core components almostly are from the import.