|
Model
|
RTS-50
|
RTS-80
|
RTS-100
|
RTS-150
|
RTS-200
|
RTS-300
|
System
|
Balanced temperature & humidity control system
|
High temp. chamber
|
60°C~200°C
|
Preheating time
|
60°C~200° about 20minutes
|
Low temp. chamber
|
A: -55℃~10℃, B: -70℃~10℃, C: -80℃~10℃
|
Precooling time
|
+20℃~-55℃ 60 minutes, +20℃~-75℃ 75 minutes, +20℃~-80℃ 90 minutes
|
Test chamber
|
A: -40℃~150℃, B: -55℃~150℃, C: -65℃~150℃
|
Recovery time
|
heat exposure 30 minutes, low exposure 30 minutes,
|
Transfer time
|
Within 10 seconds
|
Temp. flucturation
|
±1.0℃
|
Temp. deviation
|
≤±2.0℃
|
|
W40
|
W50
|
W55
|
W68
|
W68
|
W80
|
H40
|
H40
|
H45
|
H45
|
H50
|
H50
|
D32
|
D40
|
D40
|
D50
|
D60
|
D75
|
Test weight (KG)
|
3.5kg
|
5kg
|
5kg
|
5kg
|
10kg
|
12kg
|
Interior material
|
Stainless steel 304
|
Exterior material
|
Backed paiting steel or stainless steel(SUS304)
|
Insulation material
|
Rigid polyruethane foam +glass fibre
|
Cooling system
|
1. Air cooled (Water cooled type is option)
2. Singl section/cascade type, hermetic/semitight compressor,CFC free refrigerant
|
Controller
|
Color LCD screen in English/Chinese, programing,communicating function
|
Safety devices
|
No welding wire switch, compressor overheating and over current protection, over temperature protection, blower overload protection, dry heating machine protector,low water protection, fault warning system.
|
Standard accessories
|
one test hole(diam5cm), two sets of test racks, four moving wheels, 2 meters of power cord, communication interface.
|
Power
|
AC380V±10% 50HZ 3 phase 4 wires+ground wires
|