Three-phase AC Voltage Drop Simulator
Negotiable
Min.Order:1
Three-phase AC voltage drop simulator
Load capacity | Three-phase 380V 100A max |
Rated voltage | 380V |
Drop voltage | 0-120%UT(1V Step) |
electric shock | >500A |
Falling (increasing) starting phase | 0~359°(1° Step) |
Drop (raise) termination phase | 0~359°(1°Step) |
IEC standard test voltage | 0%,40%,70%,80%,120%EUT |
Fall (increasing) continuous cycle number | 1 to 999 cycles (1 cycle step) |
Fall (rise) interval frequency | 1 to 999 cycles (1 cycle step) |
Experiments | 1~9999 Times |
Working power | Single-phase power supply AC 100V~250V 50/60Hz |
The working power supply of the tested product | Three-phase AC380V±10% or Single-phase AC220V±10% |
1.1.Fully Automatic Karl Fischer Water Content Tester
TP-2100
2.Digital Karl Fischer Water Content Tester TP-6A
3.Kinematic Viscosity Tester VST-2000
4.Kinematic Viscosity Tester TPV-8
5.Kinematic Viscosity Tester VST-3000
6.Fully Automatic Oil Acidity Tester (6 cups) ACD-3000I
7.Fully Automatic Surface/Interface Tension Tester IT-800
8.Automatic Surface/Interface Tension Tester (Platinum Plate Method) IT-800P
9.Fully Automatic Open Cup Flash Point Tester TPO-3000
10.Fully Automatic Closed Cup Flash Point Tester TPC-3000
11.Digital Open Cup Flash Point Tester TPO-100
12.Digital Closed Cup Flash Point Tester TPC-100
13.Cloud Point & Pour Point Tester PT-2000
MOQ | 1 Set |
Trade Terms | EXW, FOB, CIF, CFR |
Payment Terms | T/T, L/C |
Port of Loading | Any Port of China |
Packing Method | Internaional Standard Wooden Case |
Transportation Method | By Sea, By Land, By Air, By Express |
Supply Capability | 100 Sets/Month |
* The warranty period is 24 months from commissioning acceptance date on. After the warranty period is over we provide lifelong maintenance and technical service.
* We guarantee the maintenance time no more than 3 working days and response time within 1 hour.
* We build instrument service profile for our clients to record the product service and maintenance conditions.
* After instruments start service, we will pay follow-ups to collect the service conditions.
Located at Chongqing city--a southwest electromechanical manufacturing center as well as national municipality, Chongqing TOP is a professional leading manufacturer and supplier of oil purifiers and various related testers. Our company consists of departments respectively for technological development, machinery manufacture, instrument manufacture and quality control etc.