High Capacity 200 Liters Per Day Edible Oil Recycling Plant Model COP
Negotiable
Min.Order:1
Parameters | Unit | COP-10 | COP-20 | COP-30 | COP-100 | COP-150 | COP-200 | COP-300 | ||||||
Flow Rate | L/min | 10 | 20 | 30 | 100 | 150 | 200 | 300 | ||||||
Working Vacuum | MPa | -0.06 ~ -0.095 | ||||||||||||
Working Pressure | MPa | ≤0.4 | ||||||||||||
Temperature Range | ℃ | 0 ~ 100 | ||||||||||||
Power supply | 380V,50Hz, 3 phase (or as customized) | |||||||||||||
Working noise | dB(A) | ≤75 | ≤75 | ≤75 | ≤75 | ≤75 | ≤80 | ≤82 | ||||||
Heating power | KW | 12 | 18 | 21 | 40 | 45 | 72 | 80 | ||||||
Total power | KW | 15 | 21 | 25 | 45 | 52 | 82 | 90 | ||||||
Inlet/outlet | mm | 25 | 25 | 25 | 42 | 50 | 50 | 60 | ||||||
Net weight | Kg | 450 | 550 | 600 | 850 | 1000 | 1200 | 1500 | ||||||
Overall dimensions | mm | 1500×1000×1200 | 1500×1050×1600 | 1500×1050×1650 | 1750×1250×1800 | 1900×1600×1950 | 1900×1600×1950 | 2100×1700×2100 |
Item | Unit | Index after Filtering |
Moisture content | PPM | ≤50 |
Gas content | % | 0.1 |
Impurity siz | micro | ≤1 |
Demulsification value | fresh oil≤15min, oil in operation≤30 | |
Degree of cleanliness | ≤4(NAS 1638) |
Standard wooden case is stable enough to transport for long jurney. In addition, we will double check for your goods before delivery.
Shipping method:Usually by sea, but air freight is avalible.
Located at Chongqing city--a southwest electromechanical manufacturing center as well as national municipality, Chongqing TOP is a professional leading manufacturer and supplier of oil purifiers and various related testers. Our company consists of departments respectively for technological development, machinery manufacture, instrument manufacture and quality control etc. On basis of mature development and manufacture technology and highly qualified production management team, the products have high quality, easy operation, excellent performance and long service life.
Factory Manufacture
What is the mini order quantity?
MOQ: generally 1 unit/piece/set
What payment methods are supported?
Payment method: By T/T, L/C, Alibaba Trade Assurance etc.
Payment terms: Generally, T/T 40% advanced, the balance paid by T/T when the machine is ready; or 100% irrevocable L/C at sight.
What are the available delivery methods?
Our port location: Chongqing, Shanghai or other main port of China
Delivering to: Worldwide
Delivering method: by sea, by air, by truck, by express, combined transportation
How long is the product date of delivery probably?
Delivery date differs with product type, order quantity, special requirement etc. Usually our big machine delivery date is around 10 ~ 20 days; test equipment or analyzer delivery date is around 5~10 days. Some products have stock, contact us anytime to get more information.
How long is the warranty period?
We warrants the plant supplied under agreed specification against defects in material and workmanship under normal use and service for a period of 2 years after start up of the system.
How is the technical services on the product?
Engineer available to service machinery overseas. If you have any technical question, you are welcome to contact us any time. We will response promptly and answer to your satisfaction. If required and necessary, we can send our engineer to your place to provide technical support.