CE proved insulate oil bdv transformer oil strength tester
Negotiable
Min.Order:1
Newly Closed Cup Flash Point Tester Automatic Flash Point Trst Apparatus
TP-12A Cooking Oil Tester to test Acid Value, Peroxide Value, Sesame Oil Purity Analyzer
Fully automatic laboratory moisture tester / ASTM D4928 standard water analysis equipment
Fully Automatic Synthetic Blood Liquid And Oil Surface Tension Measurement Equipment
TP-6371 Lab Equipment CFPP ASTM D6371 Approved Cold Filter Plugging Point Cloud Pour Point Tester
IIJ-II series fully automatic transformer oil strength tester is designed as per IEC156 to test the breakdown voltage of oil. With proper programming, it has functions of auto boosting, stepping down, stirring, displaying and printing out results.
Features
1) Fully automatic, control by microcomputer, utilization of new I/O terminal.
2) Numbers of times of testing and idling time of stirring are set via digital setting.
3) Test results displayed and printed out automatically.
4) Strong capability of anti-interference.
5) High accuracy of testing and high capacity of anti-jamming.
6) Easy to operate, small size, light weight which operated in the open air very conveniently and convenient for maintenance
7) Can store 99 groups oil testing data which is convenient to reading and print. The testing data can keep 100 years under the condition of power off.
8) System time can go on running under power off.(the system time just for reference can not be the standard of timing)
Power supply | AC220V±10%, 50Hz/60Hz |
Output voltage | 60kV/80kV/100 kV |
Capacity | 2.0 kVA |
Speed of voltage increase | about 2 k V/ s |
Voltage inspection accuracy | 1 % |
Breakdown sensitivity | < 0.1 kV |
Waveform distortion | ≤ 1 % |
Breakdown response time | ≤ 10 ms |
Polar distance | 2.5 mm |
Storage environment | Temperature: 0 ℃ -40 ℃ |
Humidity: Max. relative humidity 85% | |
Storage environment | Temperature: - 20 ℃ - 60 ℃ |
Humidity: Max. relative humidity 75% | |
Dimension | 380mm*380mm*380mm |
Weight | 32kg(N.W.) |
Stirrer
What is the mini order quantity?
MOQ: generally 1 unit/piece/set
What payment methods are supported?
Payment method: By T/T, L/C, Alibaba Trade Assurance etc.
Payment terms: Generally, T/T 40% advanced, the balance paid by T/T when the machine is ready; or 100% irrevocable L/C at sight.
What are the available delivery methods?
Our port location: Chongqing, Shanghai or other main port of China
Delivering to: Worldwide
Delivering method: by sea, by air, by truck, by express, combined transportation
How long is the product date of delivery probably?
Delivery date differs with product type, order quantity, special requirement etc. Usually our big machine delivery date is around 10 ~ 20 days; test equipment or analyzer delivery date is around 5~10 days. Some products have stock, contact us anytime to get more information.
How long is the warranty period?
We warrants the plant supplied under agreed specification against defects in material and workmanship under normal use and service for a period of 2 years after start up of the system.
How is the technical services on the product?
Engineer available to service machinery overseas. If you have any technical question, you are welcome to contact us any time. We will response promptly and answer to your satisfaction. If required and necessary, we can send our engineer to your place to provide technical support.