Laboratory Electronics Heating Freezing Test Machine Environment Humidity Temperature Combined Vibration Chamber With Facto
Negotiable
Min.Order:1
Description & Application
Combined environmental test equipment integrated temperature, humidity, vibration of the three functions of the test box.With rapid temperature change rate, temperature, and humidity integrated test environment and the vibration function.
Combined environmental test equipment provides the change of temperature and humidity environment for the aerospace, aviation, petroleum, chemical, electronics, communication and other scientific research and production units, at the same time in the test chamber electric vibration stress according to the provisions of the cycle is applied to the sample, for the user of the machine (or components), electrical appliances, instruments, materials etc. temperature and humidity, vibration stress screening test, in order to assess product adaptability or experiment on behavior evaluation.
Moving method:
1. High low temperature (damp heat) test chamber with slide rail
2. Match with vibration table via moving high low temperature (damp heat) test chamber on slide rail
3. Vibration table with slide rail
4. Match with high low temperature (damp heat)test chamber via vibration table moving on slide rail .
Technical parameter
Model | HJ--225H | HJ--408f | HJ--800H | HJ--1000H |
Internal Dim.W×H×D(mm) | 600*750*500 | 800*850*600 | 1000*100*800 | 1000*1000*1000 |
External Dim.W×H×D(mm) | 900×1830×1560 | 1000×1930×1660 | 1100×2030×1860 | 1100×2030×2060 |
Temp. Range | 0°C -20°C -40°C -70°C~150°C | |||
Humi. Range | 20%RH~98%RH | |||
Frequency Range | 3~2000Hz | |||
Max.Displacement | 25mm | |||
Rated Force | 200kgf | |||
Controller | 1P PROGRAMMRLE COXTROL+SINE WAVE CONTROL SYSTEM | |||
Power Source(K.W.) | AC 3phase 380V 60/50Hz |
Q: Are your company a trading one or a factory?
A: We are a factory over13-year experience.
Q: After an order is placed, when to deliver?
A: Generally about 15 days. If we have inventory, we can arrange to ship within 3-5 days. Please be aware that our production lead times depend on specific items and item quantities.
Q: What about the product' services and quality?
A: We have Pre-service, middle-service and after-sale service. Can provide video training to show you how to install & operate. We can also arrange engineer to train the operation of equipment to customer's company when you need. Core components almostly are from the import.
Q: Our controller is self-developed, which is convenient to provide non-standard customization quickly